100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

API 1169 Study test questions test RM#3 Questions with Correct Answers

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
05-01-2026
Escrito en
2025/2026

API 1169 Study test questions test RM#3 Questions with Correct Answers

Institución
API 1169
Grado
API 1169

Vista previa del contenido

API 1169 Study test questions test RM#3 Questions with Correct Answers| Latest Update
Guaranteed Success
One main category variable of pressure test planning that an operator must consider is the
_________________. purpose


Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the
company. True


Location of casings cathode protection external anodes, and utility crossings should all be
recorded on the. as-built drawings


Releasing air or water pressure through valves, at a test head, after the testing of a pipe is
called a____________. blow down


The side of the right of way opposite the ditch line from the working side and typically the
location of the spoil pile. ditch side



CFR stands for _____________. Code of Federal Regulations



The EPA's Hazardous Substance Response information can be found in what code? 40 CFR
300


Pipelines that transport oil or natural gas from the wellhead to a transmission line. For
hazardous liquid pipelines a _________________ is a pipeline that is no more than 8 5/8 in
diameter and transports petroleum from a production gathering line


Title 49, CFR 192. The minimum depth of cover of a pipeline crossing under a drainage ditch of
a public roadway is__________________. 36"

,The toe of a weld is located _______________. at the junction of the weld face and base
metal


According to the Department of Transportation, use of the prefix àCcemonoãE is
______________ in any shipping name, when appropriate and, therefore, in aEoeGlycerol
alpha-monochlorohydrinaE the term a€oemonoaE is considered a prefix to the term
âecechlorohydrinae and may be deleted. None of these answers are correct



Pipeline segments installed by directional drilling shall be inspected for cross section
deformation



The fit of the pipe to ditch should be inspected __________ the backfilling operations. prior
to


When a bore hole is at least _____________ larger than the pipe to be installed, the end of the
drill pipe is connected to a reamer that is attached to a swivel that is connected to the product
pipe. 25%


During pneumatic tests, what needs to be installed in line to protect testing equipment and the
facility being tested? regulator


Title 49, CFR 195. A hydro-test being performed on new buried pipeline must be tested for at
least ____________ additonal hours at a pressure equal to or greater than ____________ of
MOP if it will not be visually inspected for leaks test. 4, 110%


According to OSHA, where oxygen deficiency or a hazardous atmosphere exists or could
reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas
where hazardous substances are stored nearby, the atmospheres in the excavation shall be
tested before employees enter excavations greater than _______________ in depth. 4 feet

, The stress in a pipe of wall thickness, t, acting circumferentially in a plane perpendicular to the
longitudinal axis of the pipe, produced by the pressure, P, of the fluid in pipe of diameter, D,
and is determined by BarlowaETMs formula. Hoop stress


_______________ shall be inspected during installation to determine that the carrier pipe is
supported, sealed, and insulated from the casing. Cased crossings


According to Title 29, CFR 1910, Subpart L: How close should fire extinguishers be from Class B
hazards? Within 50 feet


The actual steady state pressure at a discrete point within a pipeline system at a specific time.
Operating pressure



Corrective action is taken to prevent_____________? recurrence


A method of NDT that typically uses a dye and a contrast to reveal surface breaking
discontinuities in a weld. penetrant testing (also known as dye penetrant testing)


A condition in which a circular pipe forms into an ellipse, usually as the result of external forces.
Ovality


Per API 1104, repair to the weld face located and contained within the external reinforcement,
including external undercut is a _______________? cover pass repair



Potholing can be performed either through hand digging or ___________? hydro-vac


According to Title 49, CFR 195, Subpart E: Carbon dioxide pipelines may use inert gas or carbon
dioxide as the test medium if the maximum hoop stress during the test does not
exceed________________ percent of specified minimum yield strength and other conditions
are met. 80%

Escuela, estudio y materia

Institución
API 1169
Grado
API 1169

Información del documento

Subido en
5 de enero de 2026
Número de páginas
16
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FredJohnson Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
34
Miembro desde
7 meses
Número de seguidores
0
Documentos
13179
Última venta
22 horas hace

5.0

3 reseñas

5
3
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes