[Meer zien]LORA - Answer Level of Repair Analysis: LORA will ensure that operational readiness is achieved throughout a system's life cycle in an optimal, least cost fashion. Starting the LORA process early in a system's development, and continuous evaluation throughout its life cycle, can ensure LORA infl...
Voorbeeld 2 van de 12 pagina's
In winkelwagenLORA - Answer Level of Repair Analysis: LORA will ensure that operational readiness is achieved throughout a system's life cycle in an optimal, least cost fashion. Starting the LORA process early in a system's development, and continuous evaluation throughout its life cycle, can ensure LORA infl...
correct answers 
The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: - Answer Component Acquisition Executive (CAE). 
 
Who would certify the interoperability performance of a command and control system used by both the Army and Navy? - Ans...
Voorbeeld 2 van de 5 pagina's
In winkelwagencorrect answers 
The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: - Answer Component Acquisition Executive (CAE). 
 
Who would certify the interoperability performance of a command and control system used by both the Army and Navy? - Ans...
There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. - Answer Engineering 
 
Which appropriation category would fund the design of new equipment, material, or software? - Answer Research, Development, Test and Ev...
Voorbeeld 1 van de 4 pagina's
In winkelwagenThere are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. - Answer Engineering 
 
Which appropriation category would fund the design of new equipment, material, or software? - Answer Research, Development, Test and Ev...
What element of International Acquisition & Exportability (IA&E) assesses the risks of transferring controlled technology and information that provide U.S. warfighters a combat advantage as well as the benefits of international participation? - Answer -IA&E Planning & Analysis *incorrect* 
-Intern...
Voorbeeld 2 van de 13 pagina's
In winkelwagenWhat element of International Acquisition & Exportability (IA&E) assesses the risks of transferring controlled technology and information that provide U.S. warfighters a combat advantage as well as the benefits of international participation? - Answer -IA&E Planning & Analysis *incorrect* 
-Intern...
A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and _______________________________. - Answer All product documentation is consistent with its sup...
Voorbeeld 2 van de 10 pagina's
In winkelwagenA configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and _______________________________. - Answer All product documentation is consistent with its sup...
Using the Standard Capability Maturity Model Integration Appraisal Method for Process Improvement (SCAMPI), an organization whose acquisition processes are well documented and standardized would be rated at least: - Answer -Level 1 
-Level 2 
-*Level 3* 
-Level 4 
 
When selecting a software develop...
Voorbeeld 1 van de 4 pagina's
In winkelwagenUsing the Standard Capability Maturity Model Integration Appraisal Method for Process Improvement (SCAMPI), an organization whose acquisition processes are well documented and standardized would be rated at least: - Answer -Level 1 
-Level 2 
-*Level 3* 
-Level 4 
 
When selecting a software develop...
Taking a contractual dispute to court should be the first step in attempting to resolve controversy between the disputing parties. - Answer False 
 
Which core ethical value are you violating if you reject an opposing point of view during a disagreement and call it a shortsighted, uninformed way to...
Voorbeeld 1 van de 3 pagina's
In winkelwagenTaking a contractual dispute to court should be the first step in attempting to resolve controversy between the disputing parties. - Answer False 
 
Which core ethical value are you violating if you reject an opposing point of view during a disagreement and call it a shortsighted, uninformed way to...
When making tradeoffs among competing features, what can be used to quantifiably compare alternatives by selecting, weighting, and applying criteria? - Answer Decision matrix 
 
Ultimately, the use of open systems design is expected to result in lower life cycle costs. - Answer True 
 
One of th...
Voorbeeld 1 van de 3 pagina's
In winkelwagenWhen making tradeoffs among competing features, what can be used to quantifiably compare alternatives by selecting, weighting, and applying criteria? - Answer Decision matrix 
 
Ultimately, the use of open systems design is expected to result in lower life cycle costs. - Answer True 
 
One of th...
ACQ 202: Module 3 Exam, Part I questions with correct answers
Voorbeeld 1 van de 3 pagina's
In winkelwagenACQ 202: Module 3 Exam, Part I questions with correct answers
A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. - Answer -*True* 
-False 
 
Program cost increases and schedules slips are most likely caused by __________________, changes to the design,...
Voorbeeld 2 van de 5 pagina's
In winkelwagenA program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. - Answer -*True* 
-False 
 
Program cost increases and schedules slips are most likely caused by __________________, changes to the design,...
to minimize current and future funding risks program management offices use __________ to project and track obligations and expenditures - Answer spending plans 
 
The Earned Value Management (EVM) ___________ reveals how much it will cost to complete the program based on current program status. -...
Voorbeeld 1 van de 3 pagina's
In winkelwagento minimize current and future funding risks program management offices use __________ to project and track obligations and expenditures - Answer spending plans 
 
The Earned Value Management (EVM) ___________ reveals how much it will cost to complete the program based on current program status. -...
Which test would a contractor conduct on a software item before they integrate it with hardware? - Answer -Environmental Testing 
-Production Qualification Testing 
-*Component Testing* 
-Production Acceptance Test and Evaluation 
 
A(n) ________ occurs when an authorized federal employee signs a...
Voorbeeld 2 van de 5 pagina's
In winkelwagenWhich test would a contractor conduct on a software item before they integrate it with hardware? - Answer -Environmental Testing 
-Production Qualification Testing 
-*Component Testing* 
-Production Acceptance Test and Evaluation 
 
A(n) ________ occurs when an authorized federal employee signs a...
What does it mean if a project has a Percent Spent of 90%, Percent Scheduled of 85% and Percent Complete of 95%? - Answer The project is in good shape and should early and within budget. 
 
Your program is liable for payment on good and services received under a contract. Your payment, based on a ...
Voorbeeld 1 van de 3 pagina's
In winkelwagenWhat does it mean if a project has a Percent Spent of 90%, Percent Scheduled of 85% and Percent Complete of 95%? - Answer The project is in good shape and should early and within budget. 
 
Your program is liable for payment on good and services received under a contract. Your payment, based on a ...
When a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed by both parties, a contract change has been initiated that is _______ . - Answer Undefinitized 
 
All of the five elements (5Ms) of manufacturing cont...
Voorbeeld 1 van de 4 pagina's
In winkelwagenWhen a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed by both parties, a contract change has been initiated that is _______ . - Answer Undefinitized 
 
All of the five elements (5Ms) of manufacturing cont...
For a contract cost to be considered "allowable," it must be consistent with Government Cost Accounting Standards, Generally Accepted Accounting Principles, the terms of the contract, and the Federal Acquisition Regulation (FAR). It must also be reasonable and: - Answer -Reflected in the liabili...
Voorbeeld 1 van de 4 pagina's
In winkelwagenFor a contract cost to be considered "allowable," it must be consistent with Government Cost Accounting Standards, Generally Accepted Accounting Principles, the terms of the contract, and the Federal Acquisition Regulation (FAR). It must also be reasonable and: - Answer -Reflected in the liabili...
Tradeoffs in cost involve examining the development of alternative designs, ______ and the required industrial base capability. - Answer - Unique components 
- System life cycle costs 
- *Required technology* 
- Methods of production 
 
Some of the user capability needs of a new automated informat...
Voorbeeld 2 van de 5 pagina's
In winkelwagenTradeoffs in cost involve examining the development of alternative designs, ______ and the required industrial base capability. - Answer - Unique components 
- System life cycle costs 
- *Required technology* 
- Methods of production 
 
Some of the user capability needs of a new automated informat...
Which of the following is NOT one of the methods used to achieve a producible design? - Answer Introduce variability in the manufacturing process. 
 
A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a...
Voorbeeld 2 van de 8 pagina's
In winkelwagenWhich of the following is NOT one of the methods used to achieve a producible design? - Answer Introduce variability in the manufacturing process. 
 
A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a...
ACQ 202 Module 3 Exam: Part I Designing - Prototyping the System questions with correct answers
Voorbeeld 1 van de 2 pagina's
In winkelwagenACQ 202 Module 3 Exam: Part I Designing - Prototyping the System questions with correct answers
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper cracker. Stuvia faciliteert de betaling aan de verkoper.
Nee, je koopt alleen deze samenvatting voor $34.99. Je zit daarna nergens aan vast.
4,6 sterren op Google & Trustpilot (+1000 reviews)
Afgelopen 30 dagen zijn er 94123 samenvattingen verkocht
Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen