Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 172 study documents about .

Page 4 out of 172 results

Sort by

Virginia hic Contractor's Exam questions and correct solutions 2024
  • Virginia hic Contractor's Exam questions and correct solutions 2024

  • Exam (elaborations) • 6 pages • 2024
  • Virginia hic Contractor's Exam questions and correct solutions 2024 What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - CORRECT ANSWER-$500 fine per day for each day of violation plus penalties for a misdemeanor. What is the PRIMARY purpose of licensing? - CORRECT ANSWER-Protect the health and welfare of the public. The application for licensure MUST include - CORRECT ANSWER-the business address of the proposed designated employee....
    (0)
  • $11.49
  • + learn more
Virginia Hic/VA Contractor General  Questions and answers 2024 solutions
  • Virginia Hic/VA Contractor General Questions and answers 2024 solutions

  • Exam (elaborations) • 5 pages • 2024
  • Virginia Hic/VA Contractor General Questions and answers 2024 solutions A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - CORRECT ANSWER-The Licensee Contractor A Designated Employee should be? - CORRECT ANSWER-At least 18, Full Time, Passed Required Exams What is the initial Recovery Fund fee? - CORRECT ANSWER-$25.00 If a contractor ears more that $____...
    (0)
  • $11.49
  • + learn more
Virginia HIC updated 2024 exam  (questions and answers) 100%Correct
  • Virginia HIC updated 2024 exam (questions and answers) 100%Correct

  • Exam (elaborations) • 4 pages • 2024
  • Virginia HIC updated 2024 exam (questions and answers) 100%Correct what type of coating will not chalk when applied to exterior walls - CORRECT ANSWER-Latex paint what kind of solvent (zuulruulegch) can be used on oil-based paints - CORRECT ANSWER-Turpentine P950 where should one start painting a room - CORRECT ANSWER-ceiling what type of drywall is used that is fire resistant to ceiling - CORRECT ANSWER-Type C p916 What is the minimum width of a main entrance door in residential co...
    (0)
  • $11.49
  • + learn more
Virginia hic exam questions with  answers 100% correct
  • Virginia hic exam questions with answers 100% correct

  • Exam (elaborations) • 5 pages • 2024
  • Virginia hic exam questions with answers 100% correct The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood studs is - CORRECT ANSWER-1 1/4 inches What is the MINIMUM breaking strength required of safety belt lanyards - CORRECT ANSWER-5,400 pounds What is the MINIMUM clearance that combustible insulation MUST other heatproducing devices - CORRECT ANSWER-1 inch What is the MAXIMUM flame spread index for insulation materials - CORRECT ANSWER-25 The amount of w...
    (0)
  • $10.99
  • + learn more
 VIRGINIA HIC EXAM 2024 WITH 100% CORRECT ANSWERS
  • VIRGINIA HIC EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 6 pages • 2024
  • VIRGINIA HIC EXAM 2024 WITH 100% CORRECT ANSWERS The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood studs is - correct answer 1 1/4 inches What is the MINIMUM breaking strength required of safety belt lanyards - correct answer 5,400 pounds What is the MINIMUM clearance that combustible insulation MUST other heat-producing devices - correct answer 1 inch What is the MAXIMUM flame spread index for insulation materials - correct answer 25 The amount of wate...
    (0)
  • $13.49
  • + learn more
Virginia hic State Test Practice 2 exam 2024 updated Q&A
  • Virginia hic State Test Practice 2 exam 2024 updated Q&A

  • Exam (elaborations) • 28 pages • 2024
  • Virginia hic State Test Practice 2 exam 2024 updated Q&A After an investigation by the DPOR, what comes next in the complaint process? a. A hearing is held. b.. A meeting is held between the parties involved to determine the facts of the matter. c. Interviews with witnesses and statements are obtained. d. Interviews with witnesses and statements are obtained. - CORRECT ANSWER-b.. A meeting is held between the parties involved to determine the facts of the matter. Which of the following ...
    (0)
  • $15.99
  • + learn more
Virginia hic practice exam 2024
  • Virginia hic practice exam 2024

  • Exam (elaborations) • 2 pages • 2024
  • Virginia hic practice exam 2024 Contractors who are assessed a fee to support the Transaction Recovery Fund MUST pay this fee within a MINIMUM of how many days from when the assessment fee notice was mailed? - CORRECT ANSWER-45 days An appeal of a final decision of a county on an erosion control plan MUST be filed with a MAXIMUM of how many days? - CORRECT ANSWER-30 days All Class A contractor licensure applications MUST include: - CORRECT ANSWERInformation on the knowledge, skills, ab...
    (0)
  • $10.49
  • + learn more
Virginia hic Contractor's Exam questions and correct solutions 2024
  • Virginia hic Contractor's Exam questions and correct solutions 2024

  • Exam (elaborations) • 6 pages • 2024
  • Virginia hic Contractor's Exam questions and correct solutions 2024 What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - CORRECT ANSWER-$500 fine per day for each day of violation plus penalties for a misdemeanor. What is the PRIMARY purpose of licensing? - CORRECT ANSWER-Protect the health and welfare of the public. The application for licensure MUST include - CORRECT ANSWER-the business address of the proposed designated employee....
    (0)
  • $11.49
  • + learn more
Virginia Hic/VA Contractor General  Questions and answers 2024 solutions
  • Virginia Hic/VA Contractor General Questions and answers 2024 solutions

  • Exam (elaborations) • 5 pages • 2024
  • Virginia Hic/VA Contractor General Questions and answers 2024 solutions A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - CORRECT ANSWER-The Licensee Contractor A Designated Employee should be? - CORRECT ANSWER-At least 18, Full Time, Passed Required Exams What is the initial Recovery Fund fee? - CORRECT ANSWER-$25.00 If a contractor ears more that $____...
    (0)
  • $11.49
  • + learn more
VA Contractors: General Exam  Questions and Answers 2024
  • VA Contractors: General Exam Questions and Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • VA Contractors: General Exam Questions and Answers 2024 Which of the following estimating methods is typically used by the architect rather than the contractor? - CORRECT ANSWER-Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - CORRECT ANSWER-cost plus contract Equipment needs for a project are BEST estimated by... - CORRECT ANSWERCalculating the numb...
    (0)
  • $11.49
  • + learn more