BSOP 209 Week 7 Case Study 2 – Southwestern University, Complete solution.
  • BSOP 209 Week 7 Case Study 2 – Southwestern University, Complete solution.

  • Case • 3 pages • 2020
  • BSOP 209 Week 7 Case Study 2; Southwestern University (Answer) Southwestern University 1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take? 2. What is the probability of finishing in 270 days? 3. If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume the optimistic time estimates can be used as crash times.