Now using the information from your project proposal create a multi level work breakdown structure and detailed project schedule Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Now using the information from your project proposal create a multi level work breakdown structure and detailed project schedule? On this page you'll find 2 study documents about Now using the information from your project proposal create a multi level work breakdown structure and detailed project schedule.

All 2 results

Sort by

These are two associated papers. The second is based on the first.You have been selected to be the
  • These are two associated papers. The second is based on the first.You have been selected to be the

  • Answers • 5 pages • 2020
  • These are two associated papers. The second is based on the first.You have been selected to be the project manager (for a project of your choice). The project you choose here will be used again in Assignment 4 (Week 6) and you may be asked to reference this project in subsequent weekly discussions. The project that you decide to use should meet the key criteria of a project, such as (a) having a beginning and an end; (b) results in something being delivered to someone; (c) requires a series of a...
    (0)
  • $7.49
  • + learn more
Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.
  • Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.

  • Answers • 4 pages • 2020
  • Project Schedule Due Week 10 and worth 150 points This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for. Note.( It is to be done on groups that helps troubled kids). Part A: Project Schedule (Submit as one [1] Microsoft Project file) In Assignment 2, you developed a project plan. Now, using the info...
    (0)
  • $8.49
  • + learn more