What are some things included in HUD Guidelines - CORRECT ANSWER--
qualifications
-sampling (dust, soil, paint chip)
-control options (interim + abatement)
-clearance
-worker protection
-assessing paint condition
-HUD, EPA, OSHA CPSC, NPS lead paint rules
-questionnaire/form examples
,EPA 40 CFR Part 745 - CORRECT ANSWER-LBP Poisoning Prevention in certain
residential structures
What does EPA 40 CFR Part 745 contain? - CORRECT ANSWER--defines LBP
hazard and other related terms
-training, accreditation, work practice standards
-applicable to target housing and child occupied facilities
-renovation safe work practices
-recordkeeping/reporting requirements
-LPB disclosure to buyers/renters
-pre reqs for becoming certified
-regulatory levels for dust, soil
-how/what to sample
-requirements for state/tribal accreditation
de minimis for HUD work practice standards (also followed by EPA) - CORRECT
ANSWER-areas of deteriorated LBP treatments less than ______ do not require
work practice standards (covered in 24 CFR part 35)
2 sq ft per room equiv
, 20 sq ft exterior
10% total surface area of component type with small surface area
encapsulate - CORRECT ANSWER-formed a barrier between LBP and the
environment using a liquid applied coating or an adhesively bonded covering
material
enclosure - CORRECT ANSWER-use of rigid, durable construction materials
that are mechanically fastened to the substrate. acts as barrier between LBP and
environment.
target housing - CORRECT ANSWER-pre 1978 housing, except for those used
for strictly elderly housing
A Child occupied facility - CORRECT ANSWER-Anywhere a child 6 or under
spends a minimum 3 days in a week, 6 hours a visit and 60 hours a year.
abatement methods - CORRECT ANSWER--removal
-replacement
-encapsulation
-enclosure