100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026 BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500 QUESTIONS WITH DETAILED VERIFIED ANSWERS /ALREADY GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
44
Cijfer
A+
Geüpload op
16-10-2025
Geschreven in
2025/2026

VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026 BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500 QUESTIONS WITH DETAILED VERIFIED ANSWERS /ALREADY GRADED A+

Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
16 oktober 2025
Aantal pagina's
44
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

1|Page




VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026
BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500
QUESTIONS WITH DETAILED VERIFIED ANSWERS
/ALREADY GRADED A+




VESCP - ANSWERS--Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - ANSWERS--Stabilization


permanent or temporary soil stabilization shall be applied to denuded
areas within seven days after final grade is reached on any portion of
the site; temporary soil stabilization shall be applied within seven days
to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be
applied to areas that are to be left dormant for more than one year


Site NOT at Final Grade - ANSWERS--- stabilize in 14 days
- temporarily seed
- mulch

,2|Page


- permanently stabilize if dormant > 1 year


Site at Final Grade - ANSWERS--- stabilize in 7 days (recommended
immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - ANSWERS--Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized
or protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact
and silt fence intercepts and detains from disturbed areas


Minimum Standard 3 - ANSWERS--Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not
otherwise permanently stabilized (permanent vegetation shall not be
considered established until a ground cover is achieved that is uniform,
mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area

,3|Page




this is the standard used to verify that a site is ready for release of
bonds or surety


Minimum Standard 4 - ANSWERS--First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and
other measures intended to trap sediment shall be constructed as a
first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide
access for equipment to install the perimeter controls, but site clearing
and grading should be kept to a minimum until the perimeter controls
are in place


intercepts and detains small amounts of sediment from disturbed areas
during construction operation to prevent sediment from leaving the
site and decrease velocity of sheet flows and low-to-moderate level
channel flow


Perimeter Controls - ANSWERS--assures that sediment does not leave
the perimeter of the land-disturbing area once site clearing, grading,
and construction commences

, 4|Page


Examples: silt fences, sediment traps, sediment basins, construction
entrance, temporary diversions, diversions


Minimum Standard 5 - ANSWERS--Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as
dams, dikes, and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment
and runoff to downstream or off-site areas


Minimum Standard 6 - ANSWERS--Traps and Basins


sediment traps and basins shall be designed and constructed based
upon the total drainage area (not just disturbed area) to be served by
the trap or basin


Sediment Traps - ANSWERS--minimum storage capacity shall be 134
cubic yards per acre of drainage area and shall only control drainage
areas less than 3 acres


*stone outlet = trap*
€29,26
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
wambuimorgan041

Maak kennis met de verkoper

Seller avatar
wambuimorgan041 education to the exccelence
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
4 maanden
Aantal volgers
0
Documenten
460
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen