100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Virginia DEQ SWM Plan Reviewer Certification Newest Exam / Virginia DEQ SWM Plan Reviewer Certification Preparation/Virginia DEQ SWM Plan Reviewer Certification Practice Exam With Complete Questions And Correct Answers| Brand New Version!

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
14-10-2025
Geschreven in
2025/2026

Virginia DEQ SWM Plan Reviewer Certification Newest Exam / Virginia DEQ SWM Plan Reviewer Certification Preparation/Virginia DEQ SWM Plan Reviewer Certification Practice Exam With Complete Questions And Correct Answers| Brand New Version!

Meer zien Lees minder
Instelling
Virginia DEQ SWM
Vak
Virginia DEQ SWM









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Virginia DEQ SWM
Vak
Virginia DEQ SWM

Documentinformatie

Geüpload op
14 oktober 2025
Aantal pagina's
10
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Virginia DEQ SWM Plan Reviewer Certification Newest
Exam / Virginia DEQ SWM Plan Reviewer Certification
Preparation/Virginia DEQ SWM Plan Reviewer
Certification Practice Exam With Complete Questions And
Correct Answers| Brand New Version!
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - ans -Virginia Stormwater Management Act,
Virginia Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - ans -greater than or equal to an acre

The Stormwater Management Act requires the State Water Control Board to - ans
-permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - ans -90

The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - ans -staff of a stormwater program, anyone
contracted by a VSMP authority, standard and specification holders

The dual certificate will expire three years from - ans -the latest date of the
certificates

SWM plan must be approved by ___ before land disturbance - ans -VSMP
program authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - ans -0.41 lbs/acre/year

The phosphorus load limit uses the - ans -10% impervious cover

Part II B and II C water quantity criteria addresses - ans -channel protection and
flood protection

, The operator must submit the DEQ Notice of Termination form to the VSMP
authority - ans -within 30 days of meeting one or more of the following conditions

When is permanent vegetation considered established? - ans -uniform, mature
enough to survive, will inhibit erosion

Record drawings must be sealed and signed by a - ans -professional registered in
VA

Within ___ days of completing the requirements of the permit conditions, the
locality VSMP authority must return or terminate any bonds or securities provided
by the operator - ans -60

What legal agreement provides a VSMP inspector access to property for
conducting post-construction regulatory inspections? - ans -long-term
maintenance agreement

VSMP authorities or its designee must perform post construction inspections
every - ans -5 years

If a recorded long-term maintenance agreement is not required then the facility is
- ans -not subject to the VSMP authority post construction inspection
requirements

At a minimum, a stormwater management facility shall be inspected by the
responsible state agency on an - ans -annual basis and after any storm that causes
the capacity of the facility's principal spillway to be exceeded

Review of any plan previously disapproved shall be reviewed within _____ by the
VSPM authority - ans -45 days

A simple rooftop disconnect is not advisable for residential lots less than - ans -
6,000 ft^2

Max impervious rooftop area treated; 1,000 ft^2 per simple disconnection and
longest flow path is - ans -75 ft

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Essiekarimi walden
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16
Lid sinds
1 jaar
Aantal volgers
2
Documenten
863
Laatst verkocht
3 weken geleden
EXAM ESSENTIALS.

Welcome to your one-stop study hub! Where you Ace your exams with real exam past exams and high quality exam packs. Here you will find : >High quality' A graded study materials that have helped countless students succeed. > Comprehensive exam packs by topic eg pharmacology, Anatomy etc. >Instant downloads for quick and easy prep-anytime and anywhere. >High distinction study guides with answers. SAVE TIME, REDUCE ANXIEXTY AND REVISE WITH CONFIDENCE.

Lees meer Lees minder
4,0

4 beoordelingen

5
3
4
0
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen