100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NICET FIRE ALARM INSIGHTFUL LEVEL 2 EXAM WITH REVISION QUESTIONS AND CORRECT ANSWERS| VERIFIED

Beoordeling
-
Verkocht
-
Pagina's
105
Cijfer
A+
Geüpload op
22-09-2025
Geschreven in
2025/2026

NICET FIRE ALARM INSIGHTFUL LEVEL 2 EXAM WITH REVISION QUESTIONS AND CORRECT ANSWERS| VERIFIED Smoke detectors should be installed only after construction cleanup. There is no exception at all. - Answer FALSE. Smoke detectors should be installed only after construction cleanup EXCEPT for protection during construction What is an Addressable Device? - Answer It is a fire alarm system component that possesses discreet identification. A __________ can transmit a signal that indicates on off condition only. - Answer 3.3.132.1 Conventional Initiating Device __________ is a feature that can reduce unwanted alarms. - Answer 3.3.16 Alarm verification Fire alarms from an auxiliary system are always received at: - Answer Fire alarms from an auxiliary system are always received at the public fire service communication center. Auxiliary Fire Alarm System is connected to: - Answer Auxiliary Fire Alarm System is connected to a municipal fire alarm system. Municipal fire alarm system - Answer A public emergency alarm reporting system Auxiliary Fire Alarm System - Answer A protected premises fire alarm system or other emergency system at the protected premises and the system used to connected the protected premises system to a public emergency alarm reporting system for transmitting an alarm to the communications center. __________ Detector has a piping distribution network to the areas being protected. Air Sampling-Type detector uses a fan inside its housing to draw air. - Answer 3.3.66.1 Air sampling-type An _________ that transmits a signal indicating varying degrees of condition - Answer 3.3.132.1 Analog Initiating Device You need to request NFPA to certify your installations. True? - Answer Not true. The NFPA does not certify any installations. AHJ is responsible for approving installations. An AHJ is responsible for: - Answer An Authority Having Jurisdiction is responsible for approving an installation. What is an Annunciator? - Answer An Annunciator has multiple indicator lamps, alphanumeric displays... etc... to show status information of a circuits condition. A __________ Fire Alarm Box requires that you break a special element so to gain access to and operate the box. - Answer A Breakglass Fire Alarm Box requires that you break a special element so to gain access to and operate the box. What does Compatibility Listed mean? - Answer Compatibility Listed is a specific listing process that applies to TWO WIRE DEVICES only. Combination Detector - Answer Combination Detector can respond to multiple fire phenomenon. Equipment is LISTED - Answer The equipment is included in a list publish by an organization which is acceptable to the "AHJ" With a "non-restorable" initiating device: - Answer the sensing element will be DESTROYED during the process of operation What is a pull station? - Answer PULL STATION is a manually operated device which may be used to initiate an alarm signal. Describe NRTL: - Answer It is the Nationally Recognized Testing Laboratory that is recognized by the OSHA as meeting the qualifications specified in the Code of Federal Regulations. CODE - Answer Code are written rules that are adopted as law. What give the details on how the requirement of the code may be achieved? - Answer STANDARDS give the details on how the requirement of the code may be achieved. NFPA 72 recommends that the coverage area for a single zone should not exceed __________ square feet. - Answer 20,000 square feet NFPA 72 recommends that the coverage area for a single zone should not extend beyond a floor of a building. - Answer TRUE At the max you can have _____ waterflow switches and _____ supervisory switches connected to a single zone. - Answer At the max you can have 5 waterflow switches and 20 supervisory switches connected to a single zone. When you place smoke and heat detector on a peaked ceiling, you should measure _____ feet horizontally from the peak in both directions. - Answer When you place smoke and heat detector on a peaked ceiling, you should measure 3 feet horizontally from the peak in both directions. When you install smoke detectors under raised floors: - Answer the detectors SHOULD be mounted in an orientation in which they are listed. . The exact requirements for the location of pull stations within a building are dictated by: - Answer BUILDING CODE When deploying pull stations, they must be installed according to: - Answer NFPA 72 Talking about Sprinkler Waterflow Alarm-Initiating Device, activation should take place within _____ seconds of waterflow at the device. - Answer 90 seconds Manual fire alarm boxes should be installed in a manner which is: - Answer 17.14.8.2 conspicuous, unobstructed, and accessible In existing residential dwellings, you should have at least _____ detectors installed per floor. - Answer one (1) detector PER floor In some local jurisdictions you may consider to use heat detectors in place of smoke detectors only when: - Answer conditions are NOT favorable for smoke detection A Digital Alarm Communicator Receiver cannot accept and display signals sent from the digital alarm communicator transmitters over the public switched telephone network. True? - Answer FALSE. A Digital Alarm Communicator Receiver can accept and display signals sent from the digital alarm communicator transmitters over the public switched telephone network. An EOL relay device can supervise power for: - Answer An EOL relay device can supervise power for 4-wire smoke detectors. The Digital Alarm Communicator Transmitter is always located at: - Answer the protected premises An EOL device is always placed at the end of __________ for maintaining supervision. - Answer a class B circuit The Fire Alarm Control Panel should not be configured to supply power to detection devices. - Answer FALSE. The fire alarm control panel may supply power to the detection devices. It may be a local unit or master control unit. What ratings indicate in hours the ability of a structure to withstand fire? - Answer FIRE RATINGS Codes are the minimums that must be complied with. True? - Answer TRUE...

Meer zien Lees minder
Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Vak

Documentinformatie

Geüpload op
22 september 2025
Aantal pagina's
105
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

NICET FIRE ALARM INSIGHTFUL
LEVEL 2 EXAM 2025\2026 WITH
REVISION QUESTIONS AND CORRECT
ANSWERS| VERIFIED

Smoke detectors should be installed only after construction cleanup. There is no
exception at all. - Answer FALSE. Smoke detectors should be installed only after
construction cleanup EXCEPT for protection during construction
What is an Addressable Device? - Answer It is a fire alarm system component that
possesses discreet identification.




A __________ can transmit a signal that indicates on off condition only. - Answer
3.3.132.1 Conventional Initiating Device


__________ is a feature that can reduce unwanted alarms. - Answer 3.3.16 Alarm
verification


Fire alarms from an auxiliary system are always received at: - Answer Fire alarms
from an auxiliary system are always received at the public fire service
communication center.


Auxiliary Fire Alarm System is connected to: - Answer Auxiliary Fire Alarm
System is connected to a municipal fire alarm system.

,Municipal fire alarm system - Answer A public emergency alarm reporting system


Auxiliary Fire Alarm System - Answer A protected premises fire alarm system or
other emergency system at the protected premises and the system used to
connected the protected premises system to a public emergency alarm reporting
system for transmitting an alarm to the communications center.


__________ Detector has a piping distribution network to the areas being
protected. Air Sampling-Type detector uses a fan inside its housing to draw air. -
Answer 3.3.66.1 Air sampling-type


An _________
that transmits a signal indicating varying degrees of condition - Answer 3.3.132.1
Analog Initiating Device


You need to request NFPA to certify your installations. True? - Answer Not true.
The NFPA does not certify any installations. AHJ is responsible for approving
installations.


An AHJ is responsible for: - Answer An Authority Having Jurisdiction is
responsible for approving an installation.


What is an Annunciator? - Answer An Annunciator has multiple indicator lamps,
alphanumeric displays... etc... to show status information of a circuits condition.


A __________ Fire Alarm Box requires that you break a special element so to gain
access to and operate the box. - Answer A Breakglass Fire Alarm Box requires that
you break a special element so to gain access to and operate the box.

, What does Compatibility Listed mean? - Answer Compatibility Listed is a specific
listing process that applies to TWO WIRE DEVICES only.


Combination Detector - Answer Combination Detector can respond to multiple
fire phenomenon.


Equipment is LISTED - Answer The equipment is included in a list publish by an
organization which is acceptable to the "AHJ"


With a "non-restorable" initiating device: - Answer the sensing element will be
DESTROYED during the process of operation


What is a pull station? - Answer PULL STATION is a manually operated device
which may be used to initiate an alarm signal.


Describe NRTL: - Answer It is the Nationally Recognized Testing Laboratory that
is recognized by the OSHA as meeting the qualifications specified in the Code of
Federal Regulations.


CODE - Answer Code are written rules that are adopted as law.


What give the details on how the requirement of the code may be achieved? -
Answer STANDARDS give the details on how the requirement of the code may be
achieved.

, NFPA 72 recommends that the coverage area for a single zone should not exceed
__________ square feet. - Answer 20,000 square feet


NFPA 72 recommends that the coverage area for a single zone should not extend
beyond a floor of a building. - Answer TRUE


At the max you can have _____ waterflow switches and _____ supervisory
switches connected to a single zone. - Answer At the max you can have 5
waterflow switches and 20 supervisory switches connected to a single zone.


When you place smoke and heat detector on a peaked ceiling, you should measure
_____ feet horizontally from the peak in both directions. - Answer When you place
smoke and heat detector on a peaked ceiling, you should measure 3 feet
horizontally from the peak in both directions.


When you install smoke detectors under raised floors: - Answer the detectors
SHOULD be mounted in an orientation in which they are listed.


.


The exact requirements for the location of pull stations within a building are
dictated by: - Answer BUILDING CODE


When deploying pull stations, they must be installed according to: - Answer NFPA
72


Talking about Sprinkler Waterflow Alarm-Initiating Device, activation should take
place within _____ seconds of waterflow at the device. - Answer 90 seconds
€9,54
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
mutindampatrick12

Maak kennis met de verkoper

Seller avatar
mutindampatrick12 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
4 maanden
Aantal volgers
0
Documenten
41
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen