A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1 days production 2000 to 4000 tons Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG 62-22 PG 76-22(PMA) PG 82-22 (PMA) PG 62-22 Who cuts the density cores used for verification testing? The verification technician The contractor The independent verification testing technician None of the above The contractor 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet sublots and 4 cores per lot T/F False What is the most important for consistent compaction of asphalt mix? The mix is hotter in temperature The mix is colder in temperature The mix is uniform in temperature Temperature of the mix does not affect compaction The mix is uniform in temperature Referring to general stationing guidelines, R1 would be ____ than R2 Closer to centerline Closer to outside shoulder Closure to the inside shoulder Both A and C Both A and C While using the rolling straightedge, if the needle goes in the red zone indicating an unacceptable high spot in the section, you then Mark the pavement where the needle first goes into the red zone and place another mark where the needle leaves the red zone and continue 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above 1 inch For the first transverse joint on a project place the ___ on the new pavement while overlapping the transverse joint by one inch. 4 foot level 15 foot manual straight edge Rolling straightedge All the above 15 foot manual straight edge When calibrating to check the low side of the rolling straight edge: Place shims under the outer wheels Place the rolling straight edge on a surface that looks flat Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge Place shims under the center wheel Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge

Meer zien Lees minder
Instelling
Asphalt Paving Level 1
Vak
Asphalt Paving Level 1









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Asphalt Paving Level 1
Vak
Asphalt Paving Level 1

Documentinformatie

Geüpload op
8 augustus 2025
Aantal pagina's
11
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet




Asphalt Paving Level 1

Save




Terms in this set (32)


A full lot of super pave 2000 to 4000 tons
asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production

Which is not typically used PG 62-22
as an asphalt binder in
fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA)

Who cuts the density The contractor
cores used for verification
testing?
The verification technician
The contractor
The independent
verification testing
technician
None of the above




https://quizlet.com/1064600392/asphalt-paving-level-1-flash-cards/?new 1/11

, 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet


A full lot is composed of 5 False
sublots and 4 cores per
lot T/F

What is the most The mix is uniform in temperature
important for consistent
compaction of asphalt
mix?
The mix is hotter in
temperature
The mix is colder in
temperature
The mix is uniform in
temperature
Temperature of the mix
does not affect
compaction

Referring to general Both A and C
stationing guidelines, R1
would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside
shoulder
Both A and C

While using the rolling Mark the pavement where the needle first goes into
straightedge, if the needle the red zone and place another mark where the
goes in the red zone needle leaves the red zone and continue
indicating an
unacceptable high spot in
the section, you then




https://quizlet.com/1064600392/asphalt-paving-level-1-flash-cards/?new 2/11
€11,83
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
quizletquizizzy

Maak kennis met de verkoper

Seller avatar
quizletquizizzy Cambridge Institute Of Allied Health & Technology
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
1 jaar
Aantal volgers
0
Documenten
517
Laatst verkocht
3 weken geleden
latest papers

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen