Information Technology Project Management 8th Edition – Kathy Schwalbe – Complete Test Bank (Verified Questions and Answers)

Beoordeling
-
Verkocht
1
Pagina's
475
Cijfer
A+
Geüpload op
02-05-2025
Geschreven in
2024/2025

This document is a comprehensive test bank for Information Technology Project Management (8th Edition) by Kathy Schwalbe. It contains hundreds of verified multiple-choice, true/false, and applied scenario questions with answers, covering all key knowledge areas of project management including scope, time, cost, quality, human resources, communications, risk, procurement, and stakeholder management. Ideal for students preparing for exams, certification tests, or coursework in IT project management.

Meer zien Lees minder
Instelling
Information Technology Project
Vak
Information Technology Project











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Information Technology Project
Vak
Information Technology Project

Documentinformatie

Geüpload op
2 mei 2025
Aantal pagina's
475
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

TEST BANK For Information Technology
Project Management 9th Edition
Kathy Schwalbe, Verified Chapters




Page 1 of 475
MLK MLK MLK

,True / False
MLK MLK




1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




management in the military, computer, and construction industries.
MLK MLK MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing s MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




chedule and resource data to top management in the military, computer, and co
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




nstruction industries. Today’s project management involves much more, and p
MLK MLK MLK MLK MLK MLK MLK MLK MLK




eople in every industry and every country manage projects.
MLK MLK MLK MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Easy MLK




REFERENCES: p.2
LEARNING OBJECTIVES: MLK INFO.SCHW.14.1 - LO: 1-1 MLK MLK MLK




NATIONAL STANDARDS: MLK United States - BUSPROG: Technology
MLK MLK MLK MLK




TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge MLK




2. A difference between operations and projects is that operations end when their objectives have been
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




reached, whereas projects do not.
MLK MLK MLK MLK




a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




objectives have been reached or the project has been terminated.
MLK MLK MLK MLK MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Moderate MLK




REFERENCES: p.4
LEARNING OBJECTIVES: MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS: MLK United States - BUSPROG: Analytic
MLK MLK MLK MLK




TOPICS: What is a Project?
MLK MLK MLK




KEYWORDS: Bloom's: Comprehension MLK




3. Every project should have a well-defined objective.
MLK MLK MLK MLK MLK MLK




a. True




Page 2 of 475 MLK MLK MLK

,2



b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




defined objective. MLK




POINTS: 1
DIFFICULTY: Difficulty: Easy MLK




REFERENCES: p.6
LEARNING OBJECTIVES:
MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS:
MLK United States - BUSPROG: Analytic
MLK MLK MLK MLK




TOPICS: What is a Project?
MLK MLK MLK




KEYWORDS: Bloom's: Knowledge MLK




4. Projects should be developed in increments.
MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




defined broadly when they begin, and as time passes, the specific details of the pr
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




oject become clearer. Therefore, projects should be developed in increments.
MLK MLK MLK MLK MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Moderate MLK




REFERENCES: p.6
LEARNING OBJECTIVES:
MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS:
MLK United States - BUSPROG: Analytic
MLK MLK MLK MLK




TOPICS: What is a Project?
MLK MLK MLK




KEYWORDS: Bloom's: Comprehension MLK




5. Resources in a project should be used effectively because they are limited.
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




however, are limited and must be used effectively to meet project and other
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




corporate goals. MLK




POINTS: 1
DIFFICULTY: Difficulty: Moderate MLK




REFERENCES: p. 7
MLK




LEARNING OBJECTIVES:
MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS:
MLK United States - BUSPROG: Analytic
MLK MLK MLK MLK




TOPICS: What is a Project?
MLK MLK MLK




KEYWORDS: Bloom's: Comprehension MLK




Page 3 of 475 MLK MLK MLK

, 3



6. A project manager’s primary role is to provide the funding for a project.
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project. MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Easy MLK




REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
MLK MLK MLK MLK




NATIONAL STANDARDS: United States - BUSPROG: Analytic
MLK MLK MLK MLK MLK




TOPICS: What is a Project? MLK MLK MLK




KEYWORDS: Bloom's: Knowledge MLK




7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is so MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




metimes difficult to define its objectives clearly, estimate how long it will take to co
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




mplete, or determine how much it will cost. This uncertainty is one of the main re
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




asons project management is so challenging.
MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Moderate MLK




REFERENCES: p.7
LEARNING OBJECTIVES: MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS: MLK United States - BUSPROG: Analytic
MLK MLK MLK MLK




TOPICS: What is a Project?
MLK MLK MLK




KEYWORDS: Bloom's: Comprehension MLK




8. Questions about how a team will track schedule performance is related to a project’s scope.
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done a MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




s part of the project?”, “What unique product, service, or result does the customer
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




or sponsor expect from the project?”, or “How will the scope be verified?”
MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK MLK




POINTS: 1
DIFFICULTY: Difficulty: Moderate MLK




REFERENCES: p.7
LEARNING OBJECTIVES: MLK INFO.SCHW.14.2 - LO: 1-2 MLK MLK MLK




NATIONAL STANDARDS: MLK United States - BUSPROG: Technology
MLK MLK MLK MLK




Page 3 of 475 MLK MLK MLK

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ProfessorsAcademy stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
25
Lid sinds
10 maanden
Aantal volgers
7
Documenten
661
Laatst verkocht
4 weken geleden
EXAMSHUB!!!!

TOP RATED EXAMS & STUDY RESOURCES SHOP We offer Best Quality Exams, Testbanks, Solution manuals & Other study materials which are A+ GRADED ON Pre-order & order Basis......Buy without doubt!!!!!

5,0

232 beoordelingen

5
232
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen