100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CSI CDT Exam (2025) comprehensive questions and verified answers ( detailed & elaborated) ACTUAL EXAM 2025 TEST!!

Beoordeling
-
Verkocht
-
Pagina's
17
Cijfer
A+
Geüpload op
16-02-2025
Geschreven in
2024/2025

CSI CDT Exam (2025) comprehensive questions and verified answers ( detailed & elaborated) ACTUAL EXAM 2025 TEST!!

Instelling
CSI CDT
Vak
CSI CDT










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CSI CDT
Vak
CSI CDT

Documentinformatie

Geüpload op
16 februari 2025
Aantal pagina's
17
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

2/16/25, 7:29 PM CSI CDT Exam (2025) comprehensive questions and verified answers ( detailed & elaborated) ACTUAL EXAM 2025 TEST!! Fl…




CSI CDT Exam (2025) comprehensive questions
and verified answers ( detailed & elaborated)
ACTUAL EXAM 2025 TEST!!

Save




Practice questions for this set


Learn


Studied 7 terms


Nice work, you're crushing it



Continue studying in Learn




Terms in this set (175)


Principle stakeholder - initiates project, assumes
Owner
risk, provides funding

AHJ - Authorities Having Protect public health, safety and welfare
Jurisdiction

Address planning issues, determine design program,
identify codes and regulations, produce
Design Team procurement and construction documents,
administer construction contract, provide QA/QC
procedures




https://quizlet.com/1006557323/csi-cdt-exam-2025-comprehensive-questions-and-verified-answers-detailed-elaborated-actual-exam-2025-test-fl… 1/17

,2/16/25, 7:29 PM CSI CDT Exam (2025) comprehensive questions and verified answers ( detailed & elaborated) ACTUAL EXAM 2025 TEST!! Fl…


Entity that constructs a facility. Uses management
Contractor Team abilities to gather labor forces, subs, and
material/product/equipment suppliers

Furnishes the materials and products for the facility
Supplier Team to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.

The life cycle of a facility, from concept through
construction to use and eventual deconstruction.
Project Conception
Project Delivery
Facility Life Cycle Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)
Construction
Facility Management

Transforms the needs of owner into clear concept
Project Conception on which project can be designed. Feasibility Study,
Programming, Site Selection, Budgeting.

Determine delivery method to be used. Factors -
Project Delivery qualifications, experience, capacity, project extent,
time requirements.

Two Phases: schematic design and design
development. Deliverables include graphic and
Design
written design documents and estimates of project
cost.

Overall relationships and functions. Site plan and
area, general size/shape/massing of elements,
elevations and exteriors established, conceptual
Schematic Design
design criteria identified.
Deliverables - schematic drawings, probable cost,
preliminary schedules

Technical issues of constructibility and integration of
systems and components.
Design Development Deliverables - Tech information, outline
specifications, updated schedule, updated cost
estimate.

https://quizlet.com/1006557323/csi-cdt-exam-2025-comprehensive-questions-and-verified-answers-detailed-elaborated-actual-exam-2025-test-fl… 2/17

, 2/16/25, 7:29 PM CSI CDT Exam (2025) comprehensive questions and verified answers ( detailed & elaborated) ACTUAL EXAM 2025 TEST!! Fl…


Defined as the written and graphic documents
prepared or assembled by the A/E for
communicating the project design for construction
Construction Documents and administering the construction contract.
Construction documents include two major types of
documents: Procurement documents and Contract
documents.

Procurement Acceptance of the contractor's bid or negotiated
(Bidding/Negotiating/Pur sum and other conditions will result in award of a
chasing) contract and commencement of work.

Responsibilities:
Contractor - perform work, project coordination,
comply with project documents.
A/E - construction admin, evaluation services,
Construction certify application for payment, final inspection of
work.
Owner - provide information, process payments,
approve contract modifications, accept project
upon completion.

During occupancy, owners & facility managers
Facility Management maintain and evaluate the performance of the
project and determine suitability for continuing use.

A multi-table informational framework for
OmniClass organizing information used by the architectural,
engineering, and construction industry.

Uniform classification system for organizing
preliminary construction information into a standard
UniFormat order or sequence on the basis of systems or
assemblies. Particularly useful in conceptual design.
Element Identification.

Arranges related construction practices, logical
groupings of work results, into a series of divisions.
MasterFormat
50 division format. Used for Specifications, data
organization, and cost classification.




https://quizlet.com/1006557323/csi-cdt-exam-2025-comprehensive-questions-and-verified-answers-detailed-elaborated-actual-exam-2025-test-fl… 3/17

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Positive Walden University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
22
Lid sinds
1 jaar
Aantal volgers
1
Documenten
435
Laatst verkocht
2 weken geleden
excel

\"I specialize in key academic areas such as Psychology, Nursing, Human Resource Management, and Mathematics. Providing students with top-quality work is my priority, and I always uphold the highest scholarly standards. This commitment has earned me the distinction of being a Gold-Rated Tutor on Stuvia. You can trust my work to help you achieve excellent grades,let\'s get it right !\"

4,3

3 beoordelingen

5
2
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen