100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Samenvatting

Project Management 314 A1 Summary

Beoordeling
-
Verkocht
3
Pagina's
59
Geüpload op
05-03-2022
Geschreven in
2021/2022

The document is a summary of both the lecture slides as well as student summaries. At the back of the document, the theory that is important for the A1 has been highlighted as per what the lecturer hinted towards in lectures.

Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
5 maart 2022
Aantal pagina's
59
Geschreven in
2021/2022
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Project Man A1 Notes

Chapter 1: Introduction to project management
PROJECT MANAGEMENT:

Differing factors:
• Actual project
• Delivered on time, within budget
• Quality standards
• Stakeholders
• Limited resources

DEFINITION OF A PROJECT:

Project – a complex, non-routine, once-off, temporary effort undertaken to create a unique
product, service, or final outcome

Requires the PM to meet/exceed stakeholder needs/expectations as stated in the project
objectives

Limitations:
• Time, budget, resources and performance specifications

Classifying projects and types of projects:

4 unique needs (criteria) of a project:
1. Industry: manufacturing, IT
2. Project size: scale, complexity
3. Project scope: deliverables
4. Project application: change intervention, product development

Project types:

1. Projects (refer to definition)

2. Megaprojects:
• Large scale investment project (> $1 billion / R13 billion)
• Large impact on communities, environments and budgets
• Large risk
• Could be divided into major and minor projects

3. Programmes: a group of related projects, sub-programs, and program activities that
are managed in a coordinated manner to obtain benefits not available from
managing them individually


1

, • Aim towards some strategic objective

4. Portfolios: a component collection of programmes, projects, or operations managed
as a group to achieve strategic objectives
• Organises a series of projects and/ or programmes into a single portfolio


PROJECT CHARACTERISTICS:

• A clearly defined objective (SKA)
• Conducted through a series of interdependent tasks
• Uses different resources to complete the tasks
• Has a specific time frame and limited life span (King Shaka International Airport –
2010 soccer)
• Can be unique and can be a once-off event
• Has a customer = sponsor
• Has risk due to the level of uncertainty
• Quality, scope, cost and time are equally important to a project

PROJECT LIFECYCLE:




Project lifecycle: refers to a logical sequence of activities to accomplish the project’s goals
or objectives

PROJECT SUCCESS:

• Completing a project within budget
• On schedule (time)
• Within scope



2

, • Meeting quality standards
• Optimising resources
• Minimising or removing risks
• Optimising customer satisfaction
• Maximising stakeholder support

PROJECT MANAGEMENT CONSTRAINTS:

Traditionally there are four constraints:
1. Scope – work to be done to produce all project deliverables
2. Time – start and end date / time for each activity & task
3. Cost – agreed payment for each acceptable project deliverable
4. Quality - expectations of the acceptable specifications for the project

Further constraints influencing the project:
• Risks – uncertainty
• Resource constraints – availability/unavailability of people, equipment and materials
• Customer satisfaction – good working relationship to ensure optimum interaction,
communication and performance
• Stakeholders - optimise the working relationship amongst all stakeholders and to
limit negative conflict

PROJECT MANAGEMENT METHODOLOGIES:

Different ways to manage a project depend on: industry and type of project
• Specify inputs, outputs, performance criteria, standard operating procedures, roles,
responsibilities, workflows, control and evaluation systems

Two broad categories:
1. Traditional
2. Agile

TRADITIONAL METHODOLOGIES:

• Linear, non-iterative approaches
• Predetermined sequence of steps or stages (each stage starting only once the
previous stage has been completed)

The six most common types of traditional methodologies include:
1. Waterfall
2. Precedence diagramming method (PDM) and critical path method (CPM)
3. Critical chain project management methodology (CCPM)
4. Program evaluation and review technique (PERT)
5. PRINCE2 methodology (PRINCE stands for ‘project management in controlled
environments’)




3

, WATERFALL:

System requirements = defined in conjunction with the client:
• Client must have clear idea of their requirements upfront
• During implementation à the system is developed and tested before being handed
over to the client

Five benefits:
1. Projects are delivered according to prescribed specifications which result in client
satisfaction and project success à Negative: does not allow for much iteration -
requirements and output specifications cannot change during design and
implementation ( = no innovation)
2. Greater certainty à work allocation, scheduling and budgeting
3. Risk is minimised à errors are identified and dealt with prior to implementation
4. Structured à monitor and assessment of project performance = easier
5. Technical documentation is NB à better and easier post-handover development




PRECEDENCE DIAGRAMMING METHOD (PDM) AND CRITICAL PATH METHOD (CPM):

PDM: used to construct network diagrams
• Activities cannot begin until their predecessors have been completed

CPM: a critical path = the sequence of project network activities which add up to the longest
overall duration
• Used in conjunction with PDM
• Requires careful management à any delays to the critical path will result in a delay
to the project as a whole


CRITICAL CHAIN PROJECT MANAGEMENT METHODOLOGY (CCPM):

Critical chain: the longest chain of dependent activities

CCPM differs from CPM:
• Resources allocation is prioritised according to tasks on the critical chain




4
€10,39
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
jessiparkin

Maak kennis met de verkoper

Seller avatar
jessiparkin Stellenbosch University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
9
Lid sinds
6 jaar
Aantal volgers
4
Documenten
7
Laatst verkocht
1 maand geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen