A locality VSMP must be at least as stringent as what state permit? - CORRECT
ANSWER: The construction GP
A SWM Plan must be approved by who prior to land disturbance? - CORRECT
ANSWER: the VSMP Program Authority
all SWPPP requirements may be met by - CORRECT ANSWER: incorporating other
plans into reference, or by developing missing elements.
At what % impervious cover are streams substantially affected? - CORRECT ANSWER:
25%
BMPs use these three mechanisms to control pollution: - CORRECT ANSWER:
Infiltration, settling, and vegetative uptake
Co-located practices - CORRECT ANSWER: During construction, a facility functions for
ESC, and is later constructed into a stormwater BMP.
Define LDA - CORRECT ANSWER: Land disturbing activity; any man-made change to
the land surface that potentially changes its runoff characteristics; includes clearing,
grading, and excavation.
DEQ is responsible for enforcing the ______ while locality _______ are responsible for
enforcing local ordinances. - CORRECT ANSWER: Construction GP, VSMP
, Does a SWM plan address runoff during or after construction? - CORRECT ANSWER:
post-construction
During construction, when should inspector make sure a BMP is not installed? -
CORRECT ANSWER: BMP should not be installed before contirbuting drainage area
has been stabilized.
Every year, the locality VSMP must submit information to DEQ. When is this due, and
what info must be provided? - CORRECT ANSWER: Due by Oct. 1, and must include:
new types of SWM facilities, geographic coordinates of them, acres treated, and surface
waters/karst features into which they discharge.
How long does a locality VSMP authority have to determine the completeness of a
SWM plan? - CORRECT ANSWER: 15 days
How long does operator have to notify DEQ of an unauthorized discharge? How long
does operator have to make a written report of this? - CORRECT ANSWER: within 24
hours of discovery for notification, within 5 days for written acknowledgement.
How long does operator have to revise SWPPP if authority deems it necessary? How
long does local authority have to review any modifications to SWPPP? - CORRECT
ANSWER: 7 days for operator to make changes, 60 days for authority to review
changes.
how long does VSMP authority have to review SWM plan? - CORRECT ANSWER: 15
days to review and determine approval, and notify applicant.
How long must a VSMP authority maintain inspection reports? - CORRECT ANSWER:
For at least three years after permit termination.