100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

NEW 2025/2026 CON 3990V CERTIFICATION EXAM WITH ALL COMPLETE QUESTIONS AND DETAILED CORRECT VERIFIED ANSWERS (EXPERTLY VERIFIED) GUARANTEED PASS|ALREADY TOP RATED A+.

Beoordeling
-
Verkocht
-
Pagina's
17
Cijfer
A+
Geüpload op
27-09-2025
Geschreven in
2025/2026

NEW 2025/2026 CON 3990V CERTIFICATION EXAM WITH ALL COMPLETE QUESTIONS AND DETAILED CORRECT VERIFIED ANSWERS (EXPERTLY VERIFIED) GUARANTEED PASS|ALREADY TOP RATED A+.  CON3990V Prepare effectively for the CON 3990V certification exam 2025/2026 with confidence. This comprehensive questions covers key concepts and practical knowledge essential for certification success. Ideal for candidates aiming to confidently pass and advance their careers. Which clause is related to Acquisition? ...... ANSWER ...... 52.215- Instructions to Offerors Competitive Acquistion What is considered a contract action? ...... ANSWER ...... Contract action means any oral or written action that results in the purchase, rent, or lease of supplies or equipment, services, or construction. What is latent defect? ...... ANSWER ...... is one that is not readily noticeable upon reasonable inspection at the time of acceptance. Whoaccepts the burden of latent defect? ...... ANSWER ...... The burden is on the government to prove that defective material and workmanship was the probable cause of product failure or non-conformance. Whocanyou submit a claim to? ...... ANSWER ...... Contractor claims are submitted to the KO What is a claim? ...... ANSWER ...... a written demand or assertion by one of the contracting parties seeking (i) payment of a specific sum of money, (ii) adjustment or interpretation of contract terms, or (iii) other relief arising under or relating to the contract. Whenis written certification for a claim required? .... . ANSWER ...... When a claim exceeds $100,000, contractors must provide the following written certification (FAR 33.207). Page | 2 What are protests? ...... ANSWER .... . they provide offerors with a tool to challenge federal contract award decisions.

Meer zien Lees minder
Instelling
Nursing
Vak
Nursing










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Nursing
Vak
Nursing

Documentinformatie

Geüpload op
27 september 2025
Aantal pagina's
17
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

NEW 2025/2026 CON 3990V CERTIFICATION EXAM WITH
ALL COMPLETE QUESTIONS AND DETAILED CORRECT
Page | 1 VERIFIED ANSWERS (EXPERTLY VERIFIED) GUARANTEED
PASS|ALREADY TOP RATED A+.
 CON 3990V
Prepare effectively for the CON 3990V certification exam 2025/2026 with confidence. This
comprehensive questions covers key concepts and practical knowledge essential for certification
success. Ideal for candidates aiming to confidently pass and advance their careers.



Which clause is related to Acquisition? ...... ANSWER ...... 52.215 - Instructions to Offerors -
Competitive Acquistion


What is considered a contract action? ...... ANSWER ...... Contract action means any oral or
written action that results in the purchase, rent, or lease of supplies or equipment, services, or
construction.


What is latent defect? ...... ANSWER ...... is one that is not readily noticeable upon reasonable
inspection at the time of acceptance.


Who accepts the burden of latent defect? ...... ANSWER ...... The burden is on the
government to prove that defective material and workmanship was the probable cause of
product failure or non-conformance.


Who can you submit a claim to? ...... ANSWER ...... Contractor claims are submitted to the
KO


What is a claim? ...... ANSWER ...... a written demand or assertion by one of the contracting
parties seeking (i) payment of a specific sum of money, (ii) adjustment or interpretation of
contract terms, or (iii) other relief arising under or relating to the contract.

, When is written certification for a claim required? ...... ANSWER ...... When a claim exceeds
$100,000, contractors must provide the following written certification (FAR 33.207).


What are protests? ...... ANSWER ...... they provide offerors with a tool to challenge federal
Page | 2 contract award decisions.



Who do you file a protest with? ...... ANSWER ...... The Government Accountability Office


There is a janitorial contract for 2.8 million dollars for the entire base. What FAR part would
you use? ...... ANSWER ...... Could be FAR Part 37 Service Contracting or Far Part 12
Acquisition of Commercial Products and Commercial Services


What common form do you use for a modification? ...... ANSWER ...... SF-30


What FAR Part is Acquisition Planning? ...... ANSWER ...... FAR Part 7


What role does the Program Manager plan in Acquistion Planning? ...... ANSWER ...... The
PM has overall responsibility of a contract


What is the KO's role in Acquisition Planning? ...... ANSWER ...... Ensures plan is
implemented and developed.


What are the three phases of a life cycle? ...... ANSWER ...... Pre-award Phase
Award Phase
Post-award phase


What are the two parts of the Pre-award phase? ...... ANSWER ...... Develop Solicitation
Develop offer


Who develops a solicitation? ...... ANSWER ...... The Government & The Buyer.

, Who prepares an offer? ...... ANSWER ...... The Contractor and the seller


During the post-award phase while the contract is being performed, who has responsibility for
quality? ...... ANSWER ...... The Seller
Page | 3


What does the award phase involve? ...... ANSWER ...... Involves all work performed by the
buyer and seller


The Post-award Phase is also known as ...... ANSWER ...... Contract Administration


What is the use of a procedure that is inconsistent with the FAR? ...... ANSWER ......
Deviation


3 approaches for dealing with OCI issues ...... ANSWER ...... Avoid
Neutralize
Mitigate


How long should a solicitation be posted for? ...... ANSWER ...... 10 days


If one offeror submitted a proposal, what does the KO do? ...... ANSWER ...... KO must still
conduct the source selction process


Improper Business Practices and Personal Conflicts of Interest is what FAR Part? ......
ANSWER ...... FAR Part 3


Organizational conflict of interest is what FAR Part? ...... ANSWER ...... FAR Part 9


Openness for the contracting officer applies primarily to? ...... ANSWER ...... The Acquisition
Team
Contractors
Offerors
€31,12
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
muriithi

Maak kennis met de verkoper

Seller avatar
muriithi Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
6
Lid sinds
2 jaar
Aantal volgers
2
Documenten
647
Laatst verkocht
6 maanden geleden
HERE YOU WILL FIND IT!!!

Think,Explore,Discover and meet a new difference....here I simply want to make what you want.... And Thank You Again For Chosing Me

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen