Basics covered in Level 1 Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? 6" of compacted depth at full width In Earthwork what is a Lot? A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampling at the roadway is done for Done for base, sub grade, and embankment. Sampling is determined how generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway Minimum of three representative sample combined. What is LIMS? Laboratory Info Management System The proctor theory is when compaction is achieved how by inputting energy to expel air and water in the soil voids Compaction causes An increase in unit weight, decrease in compressibility and permeability. The proctor is determined where and creates what In a laboratory and establishes a density standard to be used on the roadway Lab proctors are created how Material is gathered from the road and prepared with different amounts of water then placed in molds and hammered What is a modified proctor used in It is used in base, sub grade, MSE wall back fill materials Modified proctors are created how With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in total. 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet used in It is used in embankment and structure back fill materials Standard proctors are created how With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in total Comparison between VT and QC density test tolerance 2 lbs/pcf What is the STRG Sampling, Testing, and Reporting Guide (state wide) A job guide schedule is project specific The material identification number for embankment in the laboratory is 004L The material identification number for embankment in the field is 004F The material identification number for base is 030 PP is short for project personel Sampling in the field it is important to sample each type of material and have enough for a representative sample When to secure samples After material is placed but before compaction effort is applied Sample transmittal card the source uses what code for the jobsite 08 For material description the minimum is always Color and texture On sample bags be sure to put Project # Sample # Location 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet itemizes the minimum requirements for sampling and testing? Sampling, testing, reporting guide Unit weight is the weight of a material occupying a volume

Meer zien Lees minder
Instelling
FDOT Earthwork Level 1
Vak
FDOT Earthwork Level 1









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
FDOT Earthwork Level 1
Vak
FDOT Earthwork Level 1

Documentinformatie

Geüpload op
8 augustus 2025
Aantal pagina's
9
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet




FDOT Earthwork Level 1

Save




Practice questions for this set


Learn 1 /7 Study with Learn




Earthwork is the excavation and placement of soils and materials supporting
the proposed roadway.



Choose an answer



Earthwork has to do with the
1 Sampling at the roadway is done for 2
roadway in what way?



3 Graph plot and counting lifts 4 If the speedy gets hot



Don't know?




Terms in this set (93)




https://quizlet.com/1064557332/fdot-earthwork-level-1-flash-cards/?new 1/9

, 8/8/25, 8:42 AM FDOT Earthwork Level 1 Flashcards | Quizlet



Nuclear Testing
Basics covered in Level 1 Speedy Moisture
Report Forms

Earthwork has to do with Earthwork is the excavation and placement of soils
the roadway in what way? and materials supporting the proposed roadway.

In Earthwork what is a lift? 6" of compacted depth at full width

A lot is 1 lift at 500 ft or within compacted area.
In Earthwork what is a Lot?
Isolated compaction operations are separate lots.

Sampling at the roadway Done for base, sub grade, and embankment.
is done for

Sampling is determined generated with random numbers usually by a
how Verification Inspector

What is important about Minimum of three representative sample combined.
sampling at the roadway

What is LIMS? Laboratory Info Management System

The proctor theory is by inputting energy to expel air and water in the soil
when compaction is voids
achieved how

An increase in unit weight, decrease in compressibility
Compaction causes
and permeability.

The proctor is determined In a laboratory and establishes a density standard to
where and creates what be used on the roadway

Material is gathered from the road and prepared with
Lab proctors are created
different amounts of water then placed in molds and
how
hammered

What is a modified proctor It is used in base, sub grade, MSE wall back fill
used in materials

Modified proctors are With a 10lb hammer(rammer) on a 18" drop with 56
created how blows per layers with 5 layers in total.



https://quizlet.com/1064557332/fdot-earthwork-level-1-flash-cards/?new 2/9
€11,93
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
quizletquizizzy

Maak kennis met de verkoper

Seller avatar
quizletquizizzy Cambridge Institute Of Allied Health & Technology
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
1 jaar
Aantal volgers
0
Documenten
517
Laatst verkocht
2 weken geleden
latest papers

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen