100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test Bank Complete_ Information Technology Project Management 9th Edition, By Kathy Schwalbe| All Chapters 1-11| Updated Edition With Detailed Answers| Rated A+

Beoordeling
-
Verkocht
-
Pagina's
583
Cijfer
A+
Geüpload op
01-07-2025
Geschreven in
2024/2025

This document contains the complete test bank for Information Technology Project Management (9th Edition) by Kathy Schwalbe, covering all chapters from 1 to 11. Each question includes a detailed, accurate answer, ideal for exam preparation and in-depth understanding of key concepts. The content reflects the updated edition and is rated A+ for quality and completeness.

Meer zien Lees minder
Instelling
Information Technology Project Management, 9e
Vak
Information Technology Project Management, 9e














Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Information Technology Project Management, 9e
Vak
Information Technology Project Management, 9e

Documentinformatie

Geüpload op
1 juli 2025
Aantal pagina's
583
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Test Bank Complete_
Information Technology Project Management 9th Edition,
By Kathy Schwalbe
All Chapters 1-11| Updated Edition With Detailed Answers| Rated A+




From: [Bestmaxsolutions.Stuvia

,Chapter 1. Introduction To Project Management ----------------------------------------------------------- 3
Chapter 2: The Project Management And Information Technology Context ----------------------- 54
Chapter 3. The Project Management Process Groups -------------------------------------------------- 105
Chapter 4. Project Integration Management ------------------------------------------------------------- 151
Chapter 5. Project Scope Management -------------------------------------------------------------------- 196
Chapter 6. Project Schedule Management ---------------------------------------------------------------- 238
Chapter 7. Project Cost Management ---------------------------------------------------------------------- 291
Chapter 8. Project Quality Management ------------------------------------------------------------------ 344
Chapter 9. Project Resource Management ---------------------------------------------------------------- 387
Chapter 10. Project Communications Management ---------------------------------------------------- 434
Chapter 11. Project Risk Management --------------------------------------------------------------------- 474

,Chapter 1. Introduction To Project Management
Kathy Schwalbe: Information Technology Project Management 9th Edition, Test Bank



TRUE / FALSE


1. Until The 1980s, Project Management Primarily Focused On Providing Schedule And
Resource Data To Top Management In The Military, Computer, And Construction
Industries.
A. True
B. False


ANSWER: True
Feedback: Until The 1980s, Project Management Primarily Focused On Providing
Schedule And Resource Data To Top Management In The Military, Computer, And
Construction Industries. Today’s Project Management Involves Much More, And People
In Every Industry And Every Country Manage Projects.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: P.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge


2. A Difference Between Operations And Projects Is That Operations End When Their
Objectives Have Been Reached, Whereas Projects Do Not.
A. True
B. False


ANSWER: False

,Feedback: Projects Are Different From Operations In That They End When Their
Objectives Have Been Reached Or The Project Has Been Terminated.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension


3. Every Project Should Have A Well-Defined Objective.
A. True
B. False


ANSWER: True
Feedback: A Project Has A Unique Purpose. Every Project Should Have A Well-
Defined Objective.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: P.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Knowledge


4. Projects Should Be Developed In Increments.
A. True
B. False


ANSWER: True

,Feedback: A Project Is Developed Using Progressive Elaboration. Projects Are Often
Defined Broadly When They Begin, And As Time Passes, The Specific Details Of The
Project Become Clearer. Therefore, Projects Should Be Developed In Increments.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension


5. Resources In A Project Should Be Used Effectively Because They Are Limited.
A. True
B. False


ANSWER: True
Feedback: A Project Requires Resources, Often From Various Areas. Resources,
However, Are Limited And Must Be Used Effectively To Meet Project And Other
Corporate Goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension


6. A Project Manager’s Primary Role Is To Provide The Funding For A Project.
A. True
B. False

,ANSWER: False
Feedback: A Project Sponsor Usually Provides The Direction And Funding For A
Project.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: P.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Knowledge


7. One Of The Main Reasons Why Project Management Is Challenging Is Because Of
The Factor Of Uncertainty.
A. True
B. False


ANSWER: True
Feedback: A Project Involves Uncertainty. Every Project Is Unique And Thus It Is
Sometimes Difficult To Define Its Objectives Clearly, Estimate How Long It Will Take
To Complete, Or Determine How Much It Will Cost. This Uncertainty Is One Of The
Main Reasons Project Management Is So Challenging.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension


8. Questions About How A Team Will Track Schedule Performance Is Related To A
Project’s Scope.

, A. True
B. False


ANSWER: False
Feedback: Project Scope Deals With Questions Such As, “What Work Will Be Done As
Part Of The Project?”, “What Unique Product, Service, Or Result Does The Customer Or
Sponsor Expect From The Project?”, Or “How Will The Scope Be Verified?”
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension


9. In Order To Be Realistic, A Project Manager Should Always Set Discrete Goals
Instead Of A Range Of Objectives.
A. True
B. False


ANSWER: False
Feedback: Projects Involve Uncertainty And Limited Resources. Thus They Rarely
Finish According To Their Original Scope, Time, And Cost Goals. Instead Of Discrete
Target Goals, It Is Often More Realistic To Set A Range Of Goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: P.8
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What Is A Project?
KEYWORDS: Bloom's: Comprehension

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Bestmaxsolutions West Virgina University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3585
Lid sinds
3 jaar
Aantal volgers
2181
Documenten
3869
Laatst verkocht
13 uur geleden
|BestMax_Solutions|Quality work From me.

Thanks in advance.On this page you will get all documents you need in your career Excellence. (Exams,Notes,Summary,Case,Essay and many more documents). All the best in you study. Message me if you can not find the document you are looking for and i will assist you. Thanks again for purchasing my documents and Review to help others who need the best doc, Also refer others so that they can benefit from my document .

4,2

554 beoordelingen

5
326
4
104
3
69
2
16
1
39

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen