1. 1 component cement, 2 half of parts sand, and five elements stone - ANS-Thrust blocks
shall be concrete of a mix now not leaner than ______________
2. 10 ft/sec - ANS-Flow required to produce pace of __________ in pipes
3. 32-forty inches - ANS-Where submit indicator valves are used, they will be set in order
that the top of each publish is _______ above very last grade
4. forty ft - ANS-A submit indicator valve installed not much less than____ from the building
5. AHJ - ANS-Working plans shall be submitted for approval to the _____ earlier than any
system is hooked up or revamped.
6. Asphalt or different corrosion-retarding cloth - ANS-All bolted joint accessories shall be
wiped clean and thoroughly covered with _______________ after installation
7. Check Valve - ANS-When a couple of water deliver exists, a ___________ will be
established in every connection
8. clear of debris - ANS-The flushing operation shall preserve till water float is
demonstrated to be ___________
9. Combined Service Mains - ANS-This preferred shall observe to ______ supposed to
carry water for fireplace carrier mains
10. completing and signing the contractors fabric and test certificates - ANS-The installing
contractor will be accountable for _______________________
11. Control Valve - ANS-All test valves shall have a ________ installed upstream and
downstream of the take a look at valve.
12. Control Valves - ANS-_____ shall be accredited in the system downstream of the
fireplace branch connection
13. Control Valves - ANS-______ shall no longer be installed inside the piping from the
fireplace branch connection to the hearth carrier essential
14. manage valves - ANS-______________ do no longer consist of drain valves, test
valves, or relief valves
15. going through uphill - ANS-Bell ends will be __________
16. flat stones, concrete slabs, or other permitted cloth - ANS-Hydrants shall be mounted on
__________
17. gauge pressure of two hundred psi or 50 psi above running pressure for 2 hours -
ANS-All piping shall be hydrostatically examined at ____________________________
18. less than 150 psi - ANS-All piping utilized in non-public fireplace provider mains will be
rated for the most gadget working stress to which the piping is exposed to but shall now
not be rated at _______________
19. less than 18 inches - ANS-The middle of a hose outlet shall now not be ____________
above final grade
20. minimum intensity of 36 inches - ANS-Private hearth service mains set up underneath
driveways or roadways will be buried at a ______________