The method of determining air content of concrete containing lightweight aggregate is the pressure method - Answer-False. Relatively dense Is the following statement true or false? When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete. - Answer-True While the technician is checking the slump of the concrete, there is a decided falling away or shearing off of concrete from one side of the sample. What should the technician do? - AnswerDisregard the test and retest on another portion of the sample. Preparation of specimens for transport includes: - Answer-Determination that at least 8 hours has elapsed since final set. If the aggregate correction factor for a given source of fine and coarse aggregate is found to be 0.2% in a pressure air meter, and an air content value of 5.0% is read on the gauge of the same air meter containing concrete with the same aggregate, what is the correct air content? - Answer-4.8% Strength test specimens transported from the field to the testing laboratory must be: - AnswerProtected from jarring, moisture loss, and freezing Tests for slump and air content must be started within ________ after obtaining the final portion of the composite sample. - Answer-5 MInutes The minimum size for samples to be used for strength test is: - Answer-1 cubic foot Is the following statement true or false? After strike off of the measure used to determine density, a small quantity of concrete may be added to correct a deficiency. - Answer-False For normal strength concretes, what temperature range must be maintained for test cylinders during initial curing? - Answer-60 to 80 degrees f (16 to 27 degrees C)Is the following statement true or false? When concrete contains large aggregate, the testing technician should wet-sieved the sample before making density (unit weight) tests for use in yield computations. - Answer-False When determining the temperature of fresh mixed concrete, what is the minimum amount of concrete cover in all directions around the sensor of the temperature measuring device? - Answer-3 inches ( 75MM) Is the following statement true or false? The sides of the slump mold should be lightly tapped to consolidate the concrete in the mold. - Answer-false
Geschreven voor
- Instelling
- ACI
- Vak
- ACI
Documentinformatie
- Geüpload op
- 3 april 2024
- Aantal pagina's
- 2
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci written
Ook beschikbaar in voordeelbundel