ACI- Concrete Field-Testing Technician - Grade 1 Exam already Passed!!
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - Answer-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - Answer-B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample. Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. A. True B. False - Answer-A. True ASTM C172 - Para (4.1.2) Q4. If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet sieved before making the test.A. True B. False - Answer-A. True ASTM C172- Para (6.1) Q5. The composite sample should not be remixed before beginning any tests. A. True B. False - Answer-B. False ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the minimum amount necessary to ensure uniformity and compliance with the maximum time limits Q6. Sampling should normally be performed, as the concrete is discharged from the mixer. A. True B. False - Answer-B. False
Geschreven voor
- Instelling
- ACI- Concrete Field-Testing Technician - Grade 1
- Vak
- ACI- Concrete Field-Testing Technician - Grade 1
Documentinformatie
- Geüpload op
- 3 april 2024
- Aantal pagina's
- 40
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci concrete field testing technician grade 1
Ook beschikbaar in voordeelbundel