Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

C4- USE OF ECDIS TO MAINTAIN SAFETY OF NAVIGATION EXAM QUESTIONS AND ANSWERS 100% PASS

Note
-
Vendu
-
Pages
20
Qualité
A+
Publié le
09-01-2026
Écrit en
2025/2026

C4- USE OF ECDIS TO MAINTAIN SAFETY OF NAVIGATION EXAM QUESTIONS AND ANSWERS 100% PASS

Établissement
ECDIS
Cours
ECDIS










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
ECDIS
Cours
ECDIS

Infos sur le Document

Publié le
9 janvier 2026
Nombre de pages
20
Écrit en
2025/2026
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

C4- USE OF ECDIS TO MAINTAIN
SAFETY OF NAVIGATION EXAM
QUESTIONS AND ANSWERS 100% PASS




Among the listed case, which must an ECDIS give an alarm? - ANS If the ship is going to reach
a critical point on the planned route.


An ECDIS is required to display which information? - ANS Hydrographic data


As per IMO performance standards, following minimum interface shall be provided to an ECDIS
EXCEPT : - ANS Bridge navigational watch alarm system


As required by the IMO performance standards for ECDIS, The following are the " single
operation actions " EXCEPT : - ANS Display two point targets on the same bearing, separated
by 40m in range


Beacuse they do not offer most of the functions vector charts do, what should only be used
where ENC are not available? - ANS A Raster Navigational Chart


C-Map charts cover actual geographic are( the world) in how many zones? - ANS 9


Can you create a Manual update from NAVTEXT message shown on the ECDIS? - ANS Yes, by
manually creating the object




1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

,Can you move your user chart from one ECDIS to another? - ANS Yes, By Creating a back-up
and restore dialogue


Compliance with regulatory requirements generic training and familiarization ECDIS including
the required competencies are increasingly being examined by these following external parties
EXCEPT: - ANS Pilots


Data are logged in the ECDIS, the following information may be logged EXCEPT: - ANS Engine
RPM


Displaying SEC Information conforms to which performance standard? - ANS The selected
safety contour is displayed with greater emphasis than other contour


During route planning and route monitoring, the following SENC information available for
display should be subdivided into the following categories EXCEPT : - ANS North up Display


During you navigation and your ECDIS gives an alarm, what is the possible cause of the alarm? -
ANS When the specified limit for deviation from the planned route is exceeded


ECDIS display must consist of the following EXCEPT? - ANS Magnetic compass deviation


ECDIS must be able to perform all the following EXCEPT: - ANS Determine magnetic compass
deviation


ECDIS provides many benefits for route planning , a few of which of the following EXCEPT: -
ANS Continues to be the primary method of collision avoidance for water transport.


For an ECDIS to be considered in compliance with SOLAS regulations, which performance
standards is it required to meet? - ANS The standard outline in IMO Resolution MSC
(232)(82).




2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, For the optimum situational awareness, what must be always recognized by navigators for
objects presented when using ECDIS? - ANS The level of display


For vessel fitted with only one ECDIS, What shall be used as the primary means of navigation ? -
ANS Paper Charts


Frequent checks should be made of the ECDIS position fixing system (normally GPS) by the use
of other means to cross check and determine vessel's position, Such checks should include the
following methods EXCEPT: - ANS Running FIx


How can you reset the ECDIS trip counter? - ANS From the count tab in the sensor


How do you determine if the ship is a full ECDIS ship? - ANS By checking Form E of the Cargo
Ship Safety Equipment Certificate.


How do you get information on an ENC object on the ECDIS? - ANS Center click on the object


How do you update your charts on the ECDIS using the ENC update disc? - ANS Use the Load
Update in the Chart Menu


How many hours that an ECDIS will be able to preserve the record of the previous track? -
ANS 12 hours


How many Lines of Position ( LOP ) Can you have in ECDIS - ANS 4 LOP's


How many seconds before the ECDIS should not need to be re-initialized? - ANS 45


How you organize the ECDIS system to Continuously checks if the ship is within a specified time
crossing a line in the chart you set in relation to the actual draft of the ship in a voyage
planning? - ANS Safety contour



3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
11,51 €
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Fyndlay Kaplan University
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
357
Membre depuis
1 année
Nombre de followers
80
Documents
18668
Dernière vente
3 jours de cela
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3,7

68 revues

5
32
4
8
3
13
2
6
1
9

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions