Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

CPIM PRACTICE QUESTIONS AND ANSWERS | 2026 UPDATE | WITH COMPLETE SOLUTION!!

Note
-
Vendu
-
Pages
35
Grade
A+
Publié le
23-12-2025
Écrit en
2025/2026

CPIM PRACTICE QUESTIONS AND ANSWERS | 2026 UPDATE | WITH COMPLETE SOLUTION!!

Établissement
CPIM - Certified In Production & Inventory Management
Cours
CPIM - Certified in Production & Inventory Management











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CPIM - Certified in Production & Inventory Management
Cours
CPIM - Certified in Production & Inventory Management

Infos sur le Document

Publié le
23 décembre 2025
Nombre de pages
35
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CPIM PRACTICE QUESTIONS AND ANSWERS | 2026
UPDATE | WITH COMPLETE SOLUTION!!




Creating an extensive distribution system in order to reduce shipment time to
customers conflicts with which of the following objectives? Answer - Lowest
distribution costs


Which is set up when a product is available from several sources but only one
source gets all of the business? Answer - Single-Source Supplier


Which originated with the department or person who will be the ultimate user
Answer - Purchase requisition


Which of the following provides insight into why the acquisition cost is often a
very small portion of the supply chain's total cost? Answer - Total cost of
ownership


Which tends to increase when shipments are by full truckload rather than less
than truckload? Answer - Carrying Costs


In the middle of April, an unusually large order comes in from a customer, at
odds with forecast data. In May, the customer's orders are more in line with
forecasts. This could be the result of: Answer - An exceptional event

,Which of the following describes the UN Global Compact Management Model?
Answer - Framework for guiding companies through the process of formally
committing to, assessing, defining, implementing, measuring, and
communicating the UN Global Compact and its principles


Per the theory of constraints (TOC), in a plant producing a complex product
with higher demand than be be produced at present, which would be the best
way listed to find "the weakest link" in the manufacturing process. Answer -
Look for a fully utilized work center with work in process inventory
accumulating before it but low work center utilization of direct downstream
work center


Which of the following is a key performance indicator critical to manufacturing
execution and an accurate reflection of the company's assets? Answer - Record
accuracy


A manufacturer places a replenishment order to replace sold or used items
every two months. This is an example of what kind of inventory model?
Answer - Fixed reorder cycle


A manager has factored in an additional three days for an order to protect
against fluctuation in lead time. If all processes run smoothly, a work center
might be able to complete orders ahead of time. What is this additional time
called? Answer - Safety lead time


What is the term for the necessary activities and techniques used by a
corporation to ensure that they always have the desired level of raw materials
to meet demand? Answer - Inventory control


What sets out the provisions and agreements of a contract? Answer - Terms
and conditions

,Which of the following is a characteristic of flow manufacturing? Answer -
Work centers are dedicated to producing similar products


Resource planning takes place at which of the following levels? Answer -
Business plan


Input/Output control is a technique for monitoring the: Answer - Capacity
requirement plan


If a manufacturer prioritizes avoiding production interruptions caused by
supply issues, what selection criterial should it prioritize in the supplier
selection process? Answer - Reliability


Which of the following tools uses mathematical algorithms or logic to perform
optimization or simulation on finite capacity scheduling Answer - Advanced
planning and scheduling


Which of thee following is a critical factor in the supplier selection process?
Answer - Supplier's manufacturing capability


What is capacity requirements planning (CRP) primarily used for? Answer -
Balancing work center capacity and load


A benefit of implementing electronic data interchange (EDI) with a supplier is a
reduction in: Answer - Data Errors


Which functional area would best be able to help engineers determine weather
a material can be used in amounts sufficient for total demand within
constraints on the final product cost? Answer - Purchasing

, Order promising is the process of Answer - Making a delivery commitment


Which of the following is the process of combining statistical forecasting
techniques and judgement to construct demand estimated for
products/services across the supply chain from the suppliers raw material to
the consumers needs? Answer - Demand planning


A guitar retailer sells four Gibson Les Pauls and a Fender Telecaster in one
week. The manager place an order to Gibson for Four Les Pauls and another
order to Fender for a single Telecaster. What is the name for this lot ordering
technique? Answer - Lot for Lot


Which of the following activities represents reverse logistics? Answer -
Returning goods to the seller for repair, remanufacture, or recycling activity.


Sales and operations plans perform which of the following action? Answer -
Reconcile all supply, demand, and new product plans at the aggregate level and
tie to the business plan


Owner's equity is defined as: Answer - The residual claim by the company's
owners or shareholders to the company's assets less its liabilities.


A workstation can produce 100 pencils per hour and possibly 20,000 per year.
This is a measure of the workstations hourly and annual Answer - Capacity


Product inventory that is accumulated by the manufacturer in advance of the
peak selling season is an example of Answer - Anticipation inventory
€21,07
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
EvaTee Phoenix University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
4996
Membre depuis
4 année
Nombre de followers
3555
Documents
51580
Dernière vente
20 heures de cela
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3,9

909 revues

5
435
4
160
3
165
2
45
1
104

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions