WGU C722 PROJECT MANAGEMENT EXAM SCRIPT 2026 VERIFIED QUESTIONS WITH CORRECT ANSWERS

Établissement
WGU C722
Cours
WGU C722










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
WGU C722
Cours
WGU C722

Infos sur le Document

Publié le
23 novembre 2025
Nombre de pages
16
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

WGU C722 PROJECT MANAGEMENT EXAM
SCRIPT 2026 VERIFIED QUESTIONS WITH
CORRECT ANSWERS


● Triple constraint. Answer: Time, Cost, and Scope


● Organizational Project Management Maturity Model (OPM3) 5 levels
(Delaware Department of Technology and Information). Answer: 1)
"Adhoc" 2) "Planned" but no org standard 3) "Managed" but execution
is inconsistent 4) "Integrated" is consistent 5) "Sustained" is consistent,
can evaluate future decisions and includes lessons learned


● 5 levels of project management maturity (Crawford, 2007). Answer: 1)
Initial 2) Structured standards 3) Organizational standards 4) Managed
Process 5) Optimized process


● Initiating (Process #1). Answer: Define the project and determine
which projects the organization will undertake. These activities often
occur prior to the selection of the project team or the project manager.


● Initiating Activities (Process #1). Answer: Document business need,
define project, evaluate proposals, complete project selection, identify
stakeholders, and create project charter

,● Which activity is preformed during the creating part of the initiating
process?. Answer: Drafting project chater


● Planning (Process #2 - Iterative). Answer: PM will assemble a team to
create the project plan. Additional team members may be required to
gather information from stakeholders, identify the project activities,
estimate costs and time, and document the planning areas


● Planning Activities (Process #2 - Iterative). Answer: Document
customer needs, estimate resource, scope, budget, schedule, WBS (Work
Breakdown Structure), Network Diagram, activity list, and writing plan
for orgs to execute


● Network Diagram. Answer: Flow chart of sequenced project activities


● Tool for PM to track that important items are addressed when
developing and defining project scope?. Answer: Network diagram


● WBS (Work Breakdown Structure). Answer: Lists the project
activities and tasks and begins to identify how they fit together and
where they fit on a calendar


● Executing (Process #3 - Iterative). Answer: PM cycles members as
needed to create the project outcomes

, ● Executing Activities (Process #3 - Iterative). Answer: Acquire
resources, train/coach resources, communicate / manage with
stakeholders, implement plan, document change requests, assess
resource performance, and recognize / reward performance


● Monitor & Control (Process #4 - Iterative). Answer: Assess whether
project plan is implemented, outcomes and deliverables are as expected.
Also, to get the project team back on the plan or make adjustments to the
plan in order to achieve the desired outcomes and deliverables


● Monitor & Control Activities (Process #4 - Iterative). Answer:
Activities are in sync, deliverables met scope, document scope change,
resolve issues, monitor schedule / budget / quality / performance / risk,
determine when replanning is needed


● Closing (Process #5). Answer: Specific actions which need to occur in
order to ensure that all project activities are completed


● Closing Activities (Process #5). Answer: Pay vendor invoice, reconcile
vendor accounts, return excess material and supplies, return assets to
orgs, writing lessons learned, complete project documentation, deliver to
customer, receive sign-off and archive all project documents


● Project Life Cycle 4 Phases. Answer: Define, Plan, Execute, Close
€10,16
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
TopGradeInsider

Faites connaissance avec le vendeur

Seller avatar
TopGradeInsider Harvard University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
6
Membre depuis
8 mois
Nombre de followers
0
Documents
2566
Dernière vente
2 semaines de cela
TopGradeInsider

Welcome to TopGradeInsider, your ultimate partner in navigating academic life. We know the pressure you’re under, which is why we’ve curated a massive library of high-quality resources designed to make your life easier. Access reliable test banks, solution manuals, and study guides that clarify complex topics and save you valuable time. Don’t let stress get in the way of your degree let TopGradeInsider give you the support you need to finish strong.

Lire la suite Lire moins
0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions