Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

SAFe Questions Exam Questions and Answers 100% Pass |Already Graded A+| Verified and Updated |Actual 2025/2026 Cheat Sheet

Note
-
Vendu
-
Pages
26
Grade
A+
Publié le
24-10-2025
Écrit en
2025/2026

SAFe Questions Exam Questions and Answers 100% Pass |Already Graded A+| Verified and Updated |Actual 2025/2026 Cheat Sheet

Établissement
SaFe Agile Advanced Scrum Master
Cours
SaFe Agile Advanced Scrum Master










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
SaFe Agile Advanced Scrum Master
Cours
SaFe Agile Advanced Scrum Master

Infos sur le Document

Publié le
24 octobre 2025
Nombre de pages
26
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

SAFe Questions
Study online at https://quizlet.com/_hus2cl

1. What description best represents Capabilities as defined in SAFe?
1. Capabilities are simply a level of abstraction above Epics, exhibiting largely
the same characteristics and practices.
2. Capability is a different name for Features, one that is preferred by some
organizations.
3. Capabilities are simply a different kind of Epic, exhibiting largely the same
characteristics and practices.
4. Capabilities are simply a level or abstraction above Features, exhibiting
largely the same characteristics and practices.: 4. Capabilities are simply a level or abstraction
above Features, exhibiting largely the same characteristics and practices.
2. What activity calls for using ROAM technique?
1. Refining the Program Backlog.
2. Managing the ART sync.
3. Categorizing program risks during PI Planning.
4. Managing teams by the Release Train Engineer.: 3. Categorizing program risks during PI
Planning.
3. (Select 2) Why is Architectural Runway important?
1. It supports a stable velocity.
2. It provides the documentation on which Features and Capabilities are built.
3. It iteratively evolves the architecture to meet changing needs.
4. It allows for nontechnical changes: 1. It supports a stable velocity.
3. It iteratively evolves the architecture to meet changing needs.
4. What is the most effective way to train the System Team members to operate
effectively as part of the train?
1. Have them attend Leading SAFe training and Scrum Master orientation.
2. Have them attend Leading SAFe training.
3. Have them attend SAFe for Teams training with all other teams on the train.
4. Have them attend Implementing SAFe training with SPC certification.
5. Have them review the SAFe Foundations presentation and provide on-the-job
training.: 3. Have them attend SAFe for Teams training with all other teams on the train.
5. What are the primary responsibilities of Program Portfolio Management
(PPM)?


, SAFe Questions
Study online at https://quizlet.com/_hus2cl

1. Governance, strategy and investment funding, program management.
2. Program management, stakeholder management, PI Planning.
3. Lightweight business case, Epic specification workshop, Budget allocation.
4. Governance, investment funding, product strategy.: 1. Governance, strategy and invest-
ment funding, program management.
6. What role would a traditional program manager most likely take on in SAFe?
1. Release Train Engineer or Value Stream Engineer.
2. Scrum master
3. Business Owner
4. Product Manager: 1. Release Train Engineer or Value Stream Engineer.
7. What activity occurs during the program Inspect and Adapt workshop?
1. PI Predictability Measure update.
2. Roadmap update
3. Team Iteration Demo
4. Biweekly System Demo
5. Iteration Metrics update: 1. PI Predictability Measure update.
8. In SAFe, who owns the Vision for a PI?
1. Product Owner
2. Business Owners
3. Scrum Master
4. COE
5. Product Management: 2. Business Owners
9. What are stretch objectives?
1. Objectives that are beyond the capacity of the team and so are uncommitted
for the PI.
2. Objectives that are part of the team's capacity but not necessarily achievable
during the PI.
3. Objectives that are identified during the PI.
4. Objectives that the business has promised to their Customers.: 2. Objectives that
are part of the team's capacity but not necessarily achievable during the PI.
10. (Select 2) What would you examine when identifying Value Streams in an
enterprise moving to SAFe?


, SAFe Questions
Study online at https://quizlet.com/_hus2cl

1. The project cost accounting procedures in place.
2. The internal departments which are supported.
3. The number of ARTs which would be contained in the Portfolio.
4. The current products which the company sells.: 2. The internal departments which are
supported.
4. The current products which the company sells.
11. The portfolio Vision is an aggregation of every Agile Release Train's Vision?
True or False: False
12. (Select 2) What applies to the Portfolio Backlog?
1. The Portfolio Kanban holds Capabilities that are ready for implementation.
2. Programs plan PIs so that they exhaust the Portfolio Backlog and only then
work on their local priorities.
3. It provides a low-cost holding area for approved Business and Enabler Epics.
4. WSJF is used to prioritize Epics in the Portfolio Backlog.: 3. It provides a low-cost holding
area for approved Business and Enabler Epics.
4. WSJF is used to prioritize Epics in the Portfolio Backlog.
13. When does the System Demo happen?
1. After the Solution Demo, but before PI Planning.
2. After every Iteration.
3. On demand.
4. After continuous integration.
5. After Pre-PI Planning.: 2. After every Iteration.
14. Test automation is typically included in the Definition of Done (DoD). True or
False: False
15. (Select 2) When might Feature size not be a good substitute for the duration
of WSJF?
1. The Feature did not originate from a Program Epic.
2. The Feature involves a team or team members who represent a bottleneck.
3. The Feature did not originate from a Value Stream Capability.
4. The Feature involves a remote third-party vendor that has a formal scope-ap-
proval process.
5. The Feature has not yet been broken down into user stories by the Product
€10,93
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
EmilyCharlene Teachme2-tutor
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
446
Membre depuis
2 année
Nombre de followers
138
Documents
21009
Dernière vente
6 jours de cela
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3,7

98 revues

5
46
4
13
3
15
2
7
1
17

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions