Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

Solutions Manual for Electrical Wiring Commercial 18th edition by phil simmons 2025

Note
-
Vendu
-
Pages
132
Grade
A+
Publié le
26-08-2025
Écrit en
2025/2026

Solutions Manual for Electrical Wiring Commercial 18th edition by phil simmons 2025

Établissement
Electrical Wiring Commercial 18th Edition
Cours
Electrical Wiring Commercial 18th edition











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Livre connecté

École, étude et sujet

Établissement
Electrical Wiring Commercial 18th edition
Cours
Electrical Wiring Commercial 18th edition

Infos sur le Document

Publié le
26 août 2025
Nombre de pages
132
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

Created By: A Solution ss ss ss




SolutionsManualforElectricalWiringCommercial18th s




ss EditionbyPhilSimmonsA+ s s s




Solution and Answer Guide s s ss ss




SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; S S S S S S S S S S S S SS




CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
SS S S S S SS SS SS




TABLE OF CONTENTS S S S S




Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students
ss ss be required to respond, where ss ss ss ss ss s s ss ss ss ss



appropriate,
s s with answers that are complete sentences. s s s s s s s s s s ss




REVIEW

Refertothe NationalElectricalCodeorthe workingdrawings whennecessary.Where
s s s s s s s s s s s s




ss applicable, responses should be written in complete sentences.
ss ss ss ss ss ss ss




1. Whatsectionofacommercialbuilding’sspecificationcontainsalistofcontract
s s s s s s s s s s s




ss documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
ss ss ss ss ss ss ss ss ss ss ss ss ss ss




ss listing of the Commercial Building contract documents is presented in this chapter under the
ss ss ss ss ss ss ss ss ss ss ss ss ss




ss heading“Commercial BuildingPlans.”Theinstructormaywish tohavethe students check over this
s s s s s s s s s s s s s ss




ss listing and compare it with the plans provided.
ss ss ss ss ss ss ss




2. Therequirement fortemporarylight and power at thejob sitewillbefound in what
s s s s s s ss s s s s s s ss




ss portion of a commercial building’s specification?
ss ss ss ss ss




Answer: The Supplementary General Conditions specifies the job site requirements for
ss ss ss ss ss ss ss ss ss ss




ss temporarylight and power. In some contracts, this electrical system becomes the responsibilityof the
s ss ss ss ss ss ss ss ss ss ss ss s ss




ss general contractor; in other contracts, it is the electrical contractor’s responsibility to install and
ss ss ss ss ss ss ss ss ss ss ss ss ss




maintain the temporaryelectrical system. Theinstructor maywish to refer the student to NEC Article
ss ss ss s ss ss s ss ss ss ss ss ss ss ss




ss 590 and discuss the requirements in detail.
ss ss ss ss ss ss




A+ Page 1 ss

,Created By: A Solution
ss ss ss




3. Theelectrician uses the Schedule of Working Drawings for what purpose?
s ss ss ss ss ss ss ss ss ss




Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
ss ss ss ss ss ss ss ss ss ss ss ss ss ss




ss drawings are at hand. The information on “the other sheets” may be very important, especially in
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss




ss coordinating with other contractors.
ss ss ss




4. Complete the following items by indicating the letter(s) designating the correct source(s)
ss ss ss ss ss ss ss ss ss ss ss




ss of information:
ss




No. Answer Item Information

4. Sections Ceiling height ss Sections, Sheet A6 ss ss




5. Electrical Electricalreceptacle s Electricalsymbolschedule,Chapter
ss symbol style
ss ss 2,Figure 2–6 ss




ss schedul
e

6. Electrical Electricaloutlet Electrical layout drawings, Sheets s ss ss




ss layout location
ss ss El,E2, and E3 ss ss




ss drawing
ss s

7. Elevations Exterior wallfinishes s s Elevations, Sheets A4 and A5 ss ss ss ss




8. Site plan ss Grading elevations ss Site plan, Sheet A4
ss ss ss




9. Electrical Panelboard schedules ss Electrical layout drawings,Sheet E4 ss ss s ss




ss layout
ss drawing
ss s

10. Architectural Room width ss Architectural floor plan, Sheets Al, ss ss ss ss




ss floor plan ss A2,and A3
ss ss




11. Architectural Swing of door ss ss Architectural floor plan, Sheets Al, ss ss ss ss




ss floor plan ss A2,and A3 ss




A+ Page 2 ss

,Created By: A Solution
ss ss ss




12. Sections View of interior wall
f ss f s s f ss Sections, Sheet A6
sf f




A+ Page 3
ss

, Created By: A Solution
ss ss ss




Match the items on the left with those on the right by writing the letter designation
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss




ss ofthe appropriate organization from the list on the right.
ss ss ss ss ss ss ss ss




13. NEC ElectricalCode s National Electrical Code (NEC) ss ss ss




14. IAEI Electrical inspectors ss
InternationalAssociationof
ElectricalInspectors (IAEI) ss




15. NFPA Fire codes ss NationalFireProtectionAssociation s s




(NFPA)

16. IESNA Lighting information s s Illuminating Engineering ss




Society ofNorth America s ss




ss (IESNA)

17. UL Listingservice Underwriters Laboratories, Inc. ss ss




(UL)

18. NEMA Manufacturers’ National Electrical ss




standards
ss ss ManufacturersAssociation
(NEMA)
ss




19. PE Seal ProfessionalEngineer (PE) s ss




Match the items on the left with those on the right by writing the letter
ss ss ss ss ss ss ss ss ss ss ss ss ss ss




ss designation ofthe proper level of NEC interpretation from the list on the
ss ss ss ss ss ss ss ss ss ss ss




ss right.


20. with Allowed by the Code ss ss ss Shall be permitted, or Shall not
ss ss ss ss ss




ss special berequired, NEC ss




ss permissi
on ss




21. with May be done ss ss Shall be permitted, or Shall not
ss s s ss s s s s




A+ Page 4 ss
€14,43
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
ExamsAdept Chamberlain College Of Nursing
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
40
Membre depuis
4 mois
Nombre de followers
3
Documents
782
Dernière vente
2 semaines de cela
TESTBANKS, SOLUTION MANUALS, ATI AND LATEST EXAMS STORE

This page contains all of the latest test banks, solution manuals, and package deals offered by seller ExamsAdept.

3,6

9 revues

5
2
4
5
3
0
2
0
1
2

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions