Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

ECCC GE Study Set Questions and Answers (Expert Solutions)

Note
-
Vendu
-
Pages
17
Grade
A+
Publié le
30-07-2025
Écrit en
2024/2025

ECCC GE Study Set Questions and Answers (Expert Solutions)

Établissement
ECCC
Cours
ECCC










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
ECCC
Cours
ECCC

Infos sur le Document

Publié le
30 juillet 2025
Nombre de pages
17
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

Page | 1



ECCC GE Study Set Questions and Answers
(Expert Solutions)


Q: GE101: Introduction to General Engineering ANS 🗹🗹: · Purpose of GE Module:
Develop officers with ability to plan and generate General Engineering effects in support
of the maneuver commander during ULO

· Definition of GE: Those engineering capabilities and activities other than combat
engineering that modify, maintain, or protect the physical environment.


Q: · GE is utilized in support of: ANS 🗹🗹: o Defense- Continuously conducted to harden
and prepare positions, facilities, installations

o Offense- Providing assured mobility of forces from ports of debarkation to forward
AOs

o Stability- Focus is likely GE capabilities applied to restore essential services and
support infrastructure development


Q: Geospatial ANS 🗹🗹: supports vertical and horizontal construction


Q: GE104: Engineer Reconnaissance ANS 🗹🗹: · Engineer Reconnaissance Is NOT a
FORM of reconnaissance. The forms are route, zone, area, reconnaissance in force, and
special.

· USACE Contingency Elements (UCE): Forward Support Team Advance (FEST-A),
Reconnaissance Team (RT), Advanced Echelon (ADVON) Team, Contingency Engineer
District (CED).

· Technical Reconnaissance vs. Tactical Reconnaissance


Q: GE105: Planning Construction Operations ANS 🗹🗹: Projects come from requestor
(unit or installation entity) identifies a need which can be met by engineer support

, Page | 2

Q: MDMP in Construction Planning 1 of 2 ANS 🗹🗹: o MDMP Step 1: Receive Mission->
Understand what you actually need to do. Gather tools, time analysis, higher intent,
shortfalls, Excess. Do not overlook geospatial.

o MDMP Step 2: Mission Analysis-> Compile analysis into one effort. Involve BDE S2
Geospatial cell


Q: MDMP in Construction Planning 2 of 2 ANS 🗹🗹: o MDMP Step 3-6: COA
development, COA analysis, COA comparison, COA approval

o MDMP Step 7: Rehearsals


Q: Real Estate ANS 🗹🗹: The overall collection of property


Q: When planning construction operations also account for...? ANS 🗹🗹: · Protection
Considerations, Sustainment Considerations...


Q: MDMP COA development produces what? ANS 🗹🗹: · different designs to meet the
commander's intent.


Q: GE107: Project Management ANS 🗹🗹: Is application of knowledge, skills, and
resources to accomplish activities that are intended to achieve a specific goal.


Q: · A project will: ANS 🗹🗹: o Not be part of ongoing day to day business.

o Involve notable risk.

o Be significantly impacted upon failure of activities.

Have at least 2 people or elements working together


Q: Project Components ANS 🗹🗹: o Time- Time to complete the project as reflected in
your project schedule.

o Money- Project budget based on cost of the resources.

Scope- Goals and tasks of project and work required to complete them

, Page | 3

Q: Project Steps ANS 🗹🗹: Defining/Initiating, Planning, Doing/Executing, Reviewing,
Monitoring and Controlling


Q: Resource Estimation ANS 🗹🗹: Reference: · Work rates from Page 174 in Battle Book,
Activity Estimation Steps (6 steps).


Q: Standard Effort Equation ANS 🗹🗹: (Quantity) X (Work Rate)


Q: Troop Effort Equation ANS 🗹🗹: (Standard Effort) / (Efficiency)


Q: Duration Equation ANS 🗹🗹: (Troop Effort) / (Crew Size)


Q: Project Equation Table ANS 🗹🗹: Quantity Work Rate Standard Effort Efficiency
Troop Effort Crew Size Duration Remarks


Q: · Node Time Estimate: ANS 🗹🗹: o Forward Pass: (Early Start) + (Duration) = (Early
Finish)

o Backward Pass: (Late Finish) - (Duration) = (Late Start)


Q: Critical Path Characteristics ANS 🗹🗹: o Longest time path through the network

o Has no float

o (Early Start) = (Late Start), (Early Finish) = (Late Finish)


Q: Total Float ANS 🗹🗹: o Total Float (TF): Amount of time an activity can be delayed
without delaying project

TF=LS-ES or TF=LF-EF


Q: Interfering Float (IF) ANS 🗹🗹: o Float which if an activity is delayed, will cause a
delay on one or more activities
€12,79
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
StudyRM

Faites connaissance avec le vendeur

Seller avatar
StudyRM University Of California - Los Angeles (UCLA)
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
3
Membre depuis
5 mois
Nombre de followers
0
Documents
4027
Dernière vente
2 mois de cela

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions