___________ use a series of questions to evaluate each potential project and then the answers to the questions would be compared to determine whether a project is accepted or rejected. A. Non-numeric project selection models B. Checklist project selection models C. Profit/Profitability project selection models correct answer B ____________ activities that occur during the project closing phase include preparation of performance reports, return of assets to the sponsoring organizations, archival of records, and documentation of lessons learned. A. Project justification B. Procurement C. Customer delivery activities D. Administrative correct answer D ____________ can allow the project to move forward in phases when not enough information is known to plan the entire project. A. Risk management plans B. Scope management plans C. Iterative planning processes

Montrer plus Lire moins
Établissement
Project Managememt
Cours
Project Managememt











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Project Managememt
Cours
Project Managememt

Infos sur le Document

Publié le
2 juillet 2025
Nombre de pages
38
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

C722 Project Management
Questions with Accurate
Answers
___________ use a series of questions to evaluate each potential
project and then the answers to the questions would be compared to
determine whether a project is accepted or rejected.
A. Non-numeric project selection models
B. Checklist project selection models
C. Profit/Profitability project selection models correct answer B


____________ activities that occur during the project closing phase
include preparation of performance reports, return of assets to the
sponsoring organizations, archival of records, and documentation of
lessons learned.
A. Project justification
B. Procurement
C. Customer delivery activities
D. Administrative correct answer D


____________ can allow the project to move forward in phases when
not enough information is known to plan the entire project.
A. Risk management plans
B. Scope management plans

,C. Iterative planning processes
D. Procurement management plans correct answer C


A ____________ documents how the quality of the project deliverables
will be measured and what steps will be taken to monitor and assure
that the quality meets the customer requirement.
A. quality management plan
B. time management plan
C. cost management plan
D. configuration Management Plan correct answer A


A decrease in the ____________ can lead to a shortened project
schedule and/or lower project costs.
A. project plan
B. project charter
C. project sponsor
D. project scope correct answer D


A decrease in the original ____________ may make it possible to
increase the project scope and/or add materials or resources that make
it possible to speed up the project schedule.
A. project costs
B. project charter

,C. project justification
D. quality management plan correct answer A


A project selection model is ____________ if it provides accurate
measures across a reasonable range of conditions.
A. Flexible
B. Realistic
C. Capable correct answer A


A project selection model is said to be ____________ when it
accurately reflects the decision making context of the company
including its capabilities and limitations.
A. Capable
B. Realistic
C.Flexible correct answer B


A typical example of ____________ in a project is the involvement of
many different people, many different materials, and many different
outcomes.
A. scrum
B. backlog
C. uncertainty
D. complexity correct answer D

, A Work Breakdown Structure is created to help ensure that
stakeholders are satisfied that the project outcomes will be achieved
and the project team understands the work that needs to be
completed.
A. True
B. False correct answer A


According to the ____________, a project manager should avoid
controlling tasks that take less than eight hours and should not let more
than two weeks go by without checking in.
A. PMI
B. PRINCE2
C. 8 and 80 Rule
D. PMBOK® correct answer C


Activities that can be performed simultaneously because they involve
different resources are called what?
A. Serial activities
B. Concurrent activities
C. Successor activities
D. Predecessor activities correct answer B
€17,57
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
starwid Yale University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
13
Membre depuis
6 mois
Nombre de followers
1
Documents
8121
Dernière vente
4 jours de cela

3,3

4 revues

5
1
4
0
3
2
2
1
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions