A business scenario is a description of a business situation or problem that describes what 3 things? correct answer past events that are relevant current key information expected or desired outcomes A Gantt chart is an example of a __________ tool. Collaboration Scheduling correct answer Scheduling Correct! Project managers use Gantt charts in the process of scheduling. A project is successful if it meets the triple constraints of what 3 things? correct answer scope, schedule, and budget A project is successful if it meets What triple constraints? correct answer 1. the project delivered what was specified in the project scope

Montrer plus Lire moins
Établissement
Project Managememt
Cours
Project Managememt











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Project Managememt
Cours
Project Managememt

Infos sur le Document

Publié le
2 juillet 2025
Nombre de pages
35
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

Project Management - C722 (Unit
2) Questions with Accurate
Answers
A business scenario is a description of a business situation or problem
that describes what 3 things? correct answer past events that are
relevant


current key information


expected or desired outcomes


A Gantt chart is an example of a __________ tool.
Collaboration
Scheduling correct answer Scheduling


Correct! Project managers use Gantt charts in the process of
scheduling.


A project is successful if it meets the triple constraints of what 3 things?
correct answer scope, schedule, and budget


A project is successful if it meets What triple constraints? correct
answer 1. the project delivered what was specified in the project scope

,2. The project was within the allotted amount of time


3. The Project was for the specified funding


According to OPM3, what takes place during the fifth and final level of
project management maturity?


Technologies and reporting are sporadic.


Metrics are put in place to collect performance data.


Lessons and best practices are applied correct answer Lessons and best
practices are applied.


Correct! The lessons learned and best practices are applied in the fifth
and final level of project management maturity.


Define Operations correct answer the ongoing, daily activities of an
organization that produce revenue and expense


Define program. correct answer a group of initiatives that support the
long-term goals and objectives of the company; it may be established
and is a group of related projects

,Define project? correct answer a temporary endeavor with a specified
start and end date


Google Drive is an example of what?




A scheduling tool


A social networking site


A collaboration site


Certification platform correct answer A collaboration site


Correct! Google Drive is a work collaboration site


In addition to the triple constraints, what other considerations may
determine if the project is successful?


A. The project is a project of high interest to the CEO.

, B. There are no government regulations that affect the product of the
project.


C. The requirements in the scope adequately define the project's
objectives. correct answer C. The requirements in the scope adequately
define the project's objectives.


Correct! The scope requirements should adequately define project
objectives


In which way can conflict be an opportunity for a project?


It can reveal something critical about the project.


It can help to establish expectations.


It can assure aggressive deliverable schedules. correct answer It can
reveal something critical about the project.


Correct! Conflict can teach the project manager and team members
something critical about the project that was not previously known.


One of the project manager's tools for communicating is the 8 and 80
Rule. What does the number 80 refer to in this rule?
€15,37
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
starwid Yale University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
13
Membre depuis
6 mois
Nombre de followers
1
Documents
8138
Dernière vente
4 jours de cela

3,3

4 revues

5
1
4
0
3
2
2
1
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions