Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

WGU C720 Competency 6: Operating Efficiency Question and answers correctly solved 2025

Note
-
Vendu
-
Pages
3
Grade
A+
Publié le
08-06-2025
Écrit en
2024/2025

WGU C720 Competency 6: Operating Efficiency Question and answers correctly solved 2025 Just-in-time (JIT) - correct answer manufacturing methodology aimed primarily at reducing flow times within production systems as well as response times from suppliers and to customers by receiving ordering and receiving inventory when ready for use or just in time for use What are the fundamental concepts of JIT? - correct answer - JIT allows materials to flow in an assembly process similar to a continuous flow process - uses general purpose machinery - produces in small batches or small lot sizes - uses a pull system - uses process facility layout

Montrer plus Lire moins
Établissement
WGU C720 Competency 6: Operating Efficiency
Cours
WGU C720 Competency 6: Operating Efficiency








Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
WGU C720 Competency 6: Operating Efficiency
Cours
WGU C720 Competency 6: Operating Efficiency

Infos sur le Document

Publié le
8 juin 2025
Nombre de pages
3
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

WGU C720 Competency 6: Operating
Efficiency Question and answers
correctly solved 2025
Just-in-time (JIT) - correct answer ✔manufacturing methodology aimed
primarily at reducing flow times within production systems as well as response
times from suppliers and to customers by receiving ordering and receiving
inventory when ready for use or just in time for use


What are the fundamental concepts of JIT? - correct answer ✔- JIT allows
materials to flow in an assembly process similar to a continuous flow process
- uses general purpose machinery
- produces in small batches or small lot sizes
- uses a pull system
- uses process facility layout


Just-in-Time 2 (JIT II) - correct answer ✔relationships with suppliers are
further strengthened beyond vendor managed inventory in which the supplier
places a representative on the customer's site that is dedicated to the
customers products only


Push System - correct answer ✔moves materials through the process
operations based on a schedule


Pull System - correct answer ✔moves materials through a system to work-
stations as they are needed
€13,13
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Academia199 Chamberlain College Of Nursing
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
350
Membre depuis
3 année
Nombre de followers
208
Documents
18964
Dernière vente
2 jours de cela

3,9

50 revues

5
27
4
6
3
7
2
3
1
7

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions