124 QUESTIONS | WITH COMPLETE
SOLUTIONS!!
1 of 124
Term
What technical process of Systems Engineering (SE) provides the
evidence that the system or system element performs its intended
functions and meets all performance requirements listed in the system
performance specification and functional and allocated
baselines?
Give this one a try later!
, Configuration Management Effective
Verification Critical Intelligence Parameters
Don't know?
2 of 124
Term
The _______________________________ guides activities in the Engineering and
Manufacturing Development (EMD) phase.
Give this one a try later!
Product Changes to the appropriation
Support Analysis (PSA)
category
Capability Development
Document (CDD) Flyaway Cost
Don't know?
3 of 124
Term
Joint Capability Technology Demonstrations (JCTDs) are a special
case of Advanced Technology Demonstrations (ATDs), and
,demonstrate the potential to eventually be fielded and used by
operational forces. Additionally, JCTDs are:
Give this one a try later!
Used for both maturing
technology & refining Failure Modes, Effects and
operational concepts in the Criticality Analysis (FMECA)
field
DoDI 5000.02, Operation of the Use BA for uses other than those
Adaptive Acquisition Framework originally intended by Congress
Don't know?
4 of 124
Term
Who is responsible for the Planning and Programming phases of the
Planning, Programming, Budgeting, and Execution (PPBE) System?
Give this one a try later!
Director, Cost Assessment
A barrier to IPPD implementation and
Program Evaluation (D,
CAPE)
Doctrine, Organization, Training,
Materiel, Leadership, Personnel,
Facilities, and Policy (DOTMLPF-P) 65-80%
Change Recommendation (DCR)
, Don't know?
5 of 124
Term
What is the primary life cycle sustainment objective of the
Engineering and Manufacturing Development (EMD) phase?
Give this one a try later!
Program Manager Defense Acquisition System
Developing the requirements
for the long-term
Upgrades and Maintenance
performance-based support
concepts
Don't know?
6 of 124
Term
Which opportunity management option includes intentionally
ignoring an opportunity because of cost, technical readiness,
resources, schedule burden, and/or low probability of successful
capture?