Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

OMIS 352 Final Exam UPDATED QUESTIONS AND CORRECT ANSWERS

Note
-
Vendu
-
Pages
38
Grade
A+
Publié le
17-05-2025
Écrit en
2024/2025

OMIS 352 Final Exam UPDATED QUESTIONS AND CORRECT ANSWERS _____ address where the project stands in terms of meeting scope, time, and cost goals a.Status reports b.Lessons-learned reports c.Technical reports d.Progress reports - CORRECT ANSWER A. Status Reports

Montrer plus Lire moins
Établissement
OMIS 352
Cours
OMIS 352











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
OMIS 352
Cours
OMIS 352

Infos sur le Document

Publié le
17 mai 2025
Nombre de pages
38
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

OMIS 352 Final Exam
UPDATED QUESTIONS AND CORRECT
ANSWERS
_____ address where the project stands in terms of meeting scope, time, and cost goals


a.Status reports

b.Lessons-learned reports

c.Technical reports

d.Progress reports - CORRECT ANSWER A. Status Reports



Analogous estimates are also known as _____ estimates.



a.

parametric

b.

bottom-up

c.
top-down

d.

budgetary - CORRECT ANSWER C. Top Down



Which of the following is true about identifying stakeholder?



a.It is not very difficult to identify stakeholders.
b.Stakeholders do not change during a project

c.Stakeholders with indirect ties to the project need not be engaged with.

,d.The project manager's family is not a potential stakeholder. - CORRECT
ANSWER C. Stakeholders with indirect ties to the project need not be engaged with



_____ generates ideas for quality improvements by comparing specific project practices or
product characteristics to those of other projects or products within or outside the performing
organization.



a.

Benchmarking

b.

Mind mapping
c.

Prototyping

d.

Systems thinking - CORRECT ANSWER A. Benchmarking



In the _____ phase, the project team creates a definitive or very accurate cost estimate,
delivers the required work, and provides performance reports to stakeholders.


a.concept
b.close-out

c.implementation

d.development - CORRECT ANSWER C. Implementation



Which of the following is one of Deming's 14 Points for Management?


a.

Eliminate the annual rating or merit system.

b.
Award business based on price tag alone rather than on other considerations.

,c.

An organization should increase dependence on inspection to achieve quality.

d.

Minimize total cost by working with multiple suppliers rather than a single supplier. -
CORRECT ANSWER A. Eliminate the annual rating or merit system



In Rizzati Corp, vice presidents in departments such as engineering, manufacturing, IT, and
human resources report directly to the chief executive officer and undertake their tasks
independently of each other. The staffs of these departments have specialized skills in their
respective disciplines. Rizatti Corp can be said to have a _____ organizational structure.



a.functional
b.symbolic
c.matrix

d.project - CORRECT ANSWER A. Functional



Which of the following refers to a set of principles that guides decision making based on
personal values of what is considered right and wrong?



a.Ethics

b.Politics

c.Civics

d.Laws - CORRECT ANSWER A. Ethics



_____ provide(s) a standard format for displaying project schedule information by listing
project activities and their corresponding start and finish dates in a calendar format



a.Gantt charts

b.PERT analysis

c.Arrow diagramming method

d.Critical path analysis - CORRECT ANSWER A. Gantt charts

, Which of the following is true of projects?



a.They have a unique purpose.
b.They are permanent in nature.

c.They have an indefinite beginning and end.

d.They are developed using regressive elaboration. - CORRECT ANSWER A. They
have a unique purpose



Important tools used in the _____ phase of the DMAIC process include a project charter, a
description of customer requirements, process maps, and Voice of the Customer (VOC) data.



a.

define

b.
improve

c.

analyze

d.

measure - CORRECT ANSWER A. Define



_____ uses highly organized and intensive workshops to bring together project
stakeholders—the sponsor, users, business analysts, programmers, and so on—to jointly
define and design information systems.



a.Use case modeling

b.Prototyping
c.JAD

d.RAD - CORRECT ANSWER C. JAD
€10,64
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
STANFORDTOPGRADES Stanford University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
26
Membre depuis
10 mois
Nombre de followers
2
Documents
4674
Dernière vente
1 semaine de cela
TOPSELLER

Hi there! I'm dedicated to sharing my high-quality study guides and helpful EXAM Materials to make your learning easier and more efficient. All my materials are well-organized and tailored to help you ace your courses. I offer genuine and dependable exam papers that are directly obtained from well-known, reputable institutions as a highly regarded professional who specializes in sourcing study materials. Kindly don't hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded and fully guaranteed

Lire la suite Lire moins
4,7

3 revues

5
2
4
1
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions