Who makes the decision about which type of strategy to use on a given fire? - Correct
Answer-Incident Commander
After company officers carry out a PAR, per order of the Incident Commander, the next
step would be to: - Correct Answer-report the results to the Incident Commander
The term made to the Incident Commander signifying that companies working in the
hazard zone are all safe and accounted for is: - Correct Answer-personnel
accountability report (PAR).
A fireground management system that addresses procedures for controlling personnel,
facilities, equipment, and communications and is designed to be expanded as needed is
the: - Correct Answer-Incident Management System
In the fire service, division of labor is necessary to: - Correct Answer-prevent duplication
of effort.
Electrical tools marked "double insulated" should have a three-prong plug that requires:
- Correct Answer-the third prong connected to a ground while the tool is in use.
The term for a roll call taken by a supervisor at an emergency incident is a: - Correct
Answer-Personnel Accountability Report.
Which of the following is not considered one of the basic duties of an engine company?
- Correct Answer-Performing technical rescue
One of the major advantages of an Incident Management System (IMS) is that it allows
agencies to communicate using common __________ and operating procedures. -
Correct Answer-terminology
The process of dividing large jobs into smaller jobs to make them more manageable is
described as: - Correct Answer-division of labor.
On the fireground, the safety officer reports to: - Correct Answer-the incident
commander.