Professional CM (Agency CM) correct answers Which one of the following is not a Project Delivery System? In lump-sum contracts, the Owner assumes the risk of cost. correct answers False Typically, the Design Reviewer has the ultimate responsibility and authority to make executive decisions related to matters affecting time and money in a construction project. correct answers False In the Design-Build project delivery system, the Owner has separate contracts with the Designer and the Contractor. correct answers False The Resident Project Representative should stop the work of the Contractor when the work is not performed according to the drawings and specifications. correct answers False Which of the following should not be performed by the Resident Project Representative for inspections? correct answers Providing instructions directly to subcontractors Which of the following is not true for the construction diary? correct answers Entries should be made on a weekly basis (i.e., at the end of each week) Ambiguous language in a contract is interpreted against the party who selected the language or supplied the contract. correct answers True According to Spearin Doctrine, when the contractor exactly follows the detail specifications and drawings, she/he will not be responsible for unsatisfactory results in the end product. correct answers True Shop drawings can be used as change orders. correct answers False Which one of the following is not an element of the Contract as we discussed in class? correct answers (Promise) Offer Acceptance Consideration Which of the following is not a condition where a contract will not be enforced by courts? correct answers Seniority Fill in the blank in the following statement: Some contracts must be in writing under the ____________ as adopted by each state. correct answers Statute of Frauds

Montrer plus Lire moins
Établissement
Con 367
Cours
Con 367









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Con 367
Cours
Con 367

Infos sur le Document

Publié le
25 mars 2025
Nombre de pages
5
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

Con 367 Exam 1 || (Needed to Pass) Confirmed A+.
Professional CM (Agency CM) correct answers Which one of the following is not a Project
Delivery System?

In lump-sum contracts, the Owner assumes the risk of cost. correct answers False

Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. correct answers
False

In the Design-Build project delivery system, the Owner has separate contracts with the Designer
and the Contractor. correct answers False

The Resident Project Representative should stop the work of the Contractor when the work is not
performed according to the drawings and specifications. correct answers False

Which of the following should not be performed by the Resident Project Representative for
inspections? correct answers Providing instructions directly to subcontractors

Which of the following is not true for the construction diary? correct answers Entries should be
made on a weekly basis (i.e., at the end of each week)

Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. correct answers True

According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. correct
answers True

Shop drawings can be used as change orders. correct answers False

Which one of the following is not an element of the Contract as we discussed in class? correct
answers (Promise)
Offer
Acceptance
Consideration

Which of the following is not a condition where a contract will not be enforced by courts?
correct answers Seniority

Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. correct answers Statute of Frauds

, RFI (Request for Information) is the document that is transmitted to the General Contractor from
the Designer to get clarifications with respect to design drawings and specifications. correct
answers False

The resident project representative should not supervise, direct, or control the contractor's means
and methods of performing work. correct answers True

In fast-track projects with multiple contractors, the services of a professional construction
management firm (Agency CM) are essential. correct answers True

A professional construction management firm (Agency CM) can participate in the following
phases of a project: correct answers Conception, Program Planning, Design, Construction, and
Closeout

The design-build process may face some legal barriers when tried to be implemented in the
public sector. correct answers True

On a multiple-prime project, the owner is responsible for coordinating the various trade
contractors with whom it has contracted. correct answers True

According to the brief article (in the supplemental reading for Week 3) about the use of Web-
based project management system used in Illinois Tollway, such system resulted in reduced
turnaround time on communications and improved access to project paperwork. correct answers
True

The Resident Project Representative does not need to make any measurement for the progress
payments in the lump-sum projects. correct answers False

Use of Building Information Modeling (BIM) in construction projects may result in a reduction
in Requests for Information (RFIs) and change orders. correct answers True

The specifications should contain absolute dimensions and avoid tolerances in those dimensions.
correct answers False

Fair subcontracting laws are in effect to protect subcontractors and the public against bid
shopping and bid peddling practices. correct answers True

The Americans with Disabilities Act (ADA) of 1990 is enforced by: correct answers Equal
Employment Opportunity Commission (EEOC)

Put in chronological order (from 1 to 5) the following 5 steps of the process of initiating a
construction project. correct answers 1. Advertise for bids
2. Open bids
3. Award contract
4. Sign the contract
5. Issue Notice to Proceed
€9,18
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
FullyFocus NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
734
Membre depuis
3 année
Nombre de followers
437
Documents
34567
Dernière vente
1 semaine de cela
Reign Supreme Scholarly || Enlightened.

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lire la suite Lire moins
3,7

110 revues

5
46
4
20
3
22
2
8
1
14

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions