PMD PRO LEVEL 1 MODULE REVIEW UPDATED QUESTIONS AND VERIFIED ANSWERS Compared with projects managed by organizations working in commercial sector, what characterisitic is unique to managing projects in the international development sector organizations? - CORRECT ANSWERProjects aspire to social and behavioral changes that improve target population well being

Montrer plus Lire moins
Établissement
PMD PRO
Cours
PMD PRO









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
PMD PRO
Cours
PMD PRO

Infos sur le Document

Publié le
20 mars 2025
Nombre de pages
9
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

PMD PRO LEVEL 1 MODULE REVIEW UPDATED QUESTIONS AND
VERIFIED ANSWERS
Compared with projects managed by organizations working in commercial sector, what characterisitic is
unique to managing projects in the international development sector organizations? - CORRECT
ANSWER✅✅✅Projects aspire to social and behavioral changes that improve target population well
being



What is the correct sequence for the different phases in the PMD Pro Project Phase Model? - CORRECT
ANSWER✅✅✅Project identification and design, project set up, project planning, and project
implementation



Which phase is continually present throughout the entirety of the PMD Pro Project Phase Model? -
CORRECT ANSWER✅✅✅Project monitoring, evaluation, and control



How many phases are there in the PMD Pro Project Phase Model for the international development
sector? - CORRECT ANSWER✅✅✅6



Which best describes the relationship between Project Management and Design, Monitoring and
Evaluation (DM&E)? - CORRECT ANSWER✅✅✅While strong DM&E is necessary component of a
project management system, it is not sufficient to ensure project success.



What area tends to be a relative weakness of project managers in the international development
sector? - CORRECT ANSWER✅✅✅Establishing a balanced approach to project management through
all phases of the life of the project



Which is NOT the responsibility of a project manager? - CORRECT ANSWER✅✅✅Assuming personal
responsibility for completing the project work



Select the missing words in the following sentence: The competency area includes the knowledge, skills
and behaviors required to identify, select and employ the right tools and processes to ensure project
management success. - CORRECT ANSWER✅✅✅Technical

, Which is an example of a 'technical' competency required of project managers? - CORRECT
ANSWER✅✅✅The ability to define and collect information and data (metrics) to monitor project
progress.



What are the three most important factors that determine the skill level of a project manager requires
to effectively manage a project? - CORRECT ANSWER✅✅✅Size, complexity, and risk of a project



Select the missing word in the following sentence: the discipline of management focuses on selecting,
initiating and managing the overall collection of projects in a way that addresses the strategic objectives
of the organization. - CORRECT ANSWER✅✅✅Portfolio



Which statement concerning portfolio management is false - CORRECT ANSWER✅✅✅It is the direct
responsibility of the project manager



What is NOT a responsibility of the project manager during the implementation phase? - CORRECT
ANSWER✅✅✅Facilitating development of the project implementation plan



Within the PMD Pro Project Phase Model which project phase is perpetually present through the life of
the project - CORRECT ANSWER✅✅✅Project monitoring evaluation and control



What need, according to Jonathan Bradshaw's classification, does the following statement describe? A
physician indicates the maternal morality rates fail to meet the Ministry of Health's minimum standards
- CORRECT ANSWER✅✅✅Normative



Which is NOT one of the purposes of a Venn diagram - CORRECT ANSWER✅✅✅Establishing roles
and responsibilities of project stakeholders



Select the missing words in the following sentence: The builds upon the outcomes from a Venn diagram,
providing the opportunity to add further narrative and more detailed data - CORRECT
ANSWER✅✅✅Stakeholder analysis matrix
€8,77
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
STANGRADES Stanford University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
48
Membre depuis
1 année
Nombre de followers
1
Documents
9625
Dernière vente
1 semaine de cela
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3,4

11 revues

5
4
4
1
3
3
2
1
1
2

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions