Construction FE Civil Exam Questions and Answers 100% Pass Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner contracts designers and builders separately. - Design-bid-build is a construction project delivery method where the designer and builder work together under a single contract from the beginning of the project in order to ensure unity and collaboration throughout the process. - Design- build Select all that clearly demonstrate an advantage of the Design-Build project delivery over the Design-Bid-Build approach: - There is single point of contractual responsibility for the owner for the entire project 2 Katelyn Whitman, All Rights Reserved © 2025 -There are contractual relationships with the Owner that prevent a conflict of interest -The design is clearly and explicitly defined at the outset of the project - The design includes significant collaboration between the Engineer and the Contractor -The schedule can be fast-tracked and construction can begin before the complete project design is finalized - The Owner will receive a project at the lowest competitive cost - There is single point of contractual responsibility for the owner for the entire project There is single point of contractual responsibility for the owner for the entire project The schedule can be fast-tracked and construction can begin before the complete project design is finalized 3 Katelyn Whitman, All Rights Reserved © 2025 An indemnification clause in an engineer's design contract is typically tied to: A. Negligent engineering design B. Claims submitted by parties affected by a failure C. Project cost overruns D. Improper construction methods by the Contractor - A. Negligent engineering design Collusion on a construction project typically refers to which of the following? A. A practice where multiple contractors conspire to fix prices or rig bids B. A system where public officials receive money from the contractor after award C. Falsely increasing the price of change order 4 Katelyn Whitman, All Rights Reserved © 2025 D. Misrepresenting the amount of work that has been completed to get advance payments - A. A practice where multiple contractors conspire to fix prices or rig bids A preconstruction conference should be he held: A. Prior to advertising for bids B. After advertising for bids but before bids are received C. After bid opening but before award of the contract D. After execution of an agreement but before Notice to Proceed - D. After execution of an agreement but before Notice to Proceed Types of submittals for engineer approval typically include all the following except: A. Product data B. Shop drawings C. Installation means and methods 5 Katelyn Whitman, All Rights Reserved © 2025 D. Mill certificates - C. Installation means and methods Which of the following statements best define what is meant by "substantial completion" with respect to a construction contract? A. Project can be used and occupied by the owner and is completely finished B. Project can be used and occupied by the owner but there is still a punch-list of minor work remaining C. Contractor's performance bond will be used to finish the remaining work D. The owner has received a final release of liens from all subcontractors - B. Project can be used and occupied by the owner but there is still a punch-list of minor work remaining a financial guarantee that the terms of a contract will be honored. If one party to a contract cannot complete their obligations, the bond is paid out to the other party to compensate for their damages or costs. - Performance bond 6 Katelyn Whitman, All Rights Reserved © 2025 OSHA requires trench protection systems be installed for the safety of workers: A. Whenever a trench is dug and workers will be working in the trench B. For trenches 5 feet deep or greater unless the trench is made entirely in stable rock C. When the work in the trench will exceed four hours D. Only if the trench is 8 feet deep or greater or 20 feet long or greater - B. For trenches 5 feet deep or greater unless the trench is made entirely in stable rock The basic responsibility for planning the means and methods of construction is that of the

Montrer plus Lire moins
Établissement
FE Civil
Cours
FE Civil











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
FE Civil
Cours
FE Civil

Infos sur le Document

Publié le
16 mars 2025
Nombre de pages
36
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

Construction FE Civil Exam Questions
and Answers 100% Pass


Is the most traditional project delivery method and appeals to those

looking for low-cost bids. In this method, the owner contracts designers

and builders separately. - ✔✔Design-bid-build


is a construction project delivery method where the designer and builder

work together under a single contract from the beginning of the project in

order to ensure unity and collaboration throughout the process. -

✔✔Design- build


Select all that clearly demonstrate an advantage of the Design-Build project

delivery over the Design-Bid-Build approach:




- There is single point of contractual responsibility for the owner for the

entire project


1
Katelyn Whitman, All Rights Reserved © 2025

,-There are contractual relationships with the Owner that prevent a conflict

of interest


-The design is clearly and explicitly defined at the outset of the project


- The design includes significant collaboration between the Engineer and

the Contractor


-The schedule can be fast-tracked and construction can begin before the

complete project design is finalized


- The Owner will receive a project at the lowest competitive cost - ✔✔There

is single point of contractual responsibility for the owner for the entire

project




There is single point of contractual responsibility for the owner for the

entire project




The schedule can be fast-tracked and construction can begin before the

complete project design is finalized



2
Katelyn Whitman, All Rights Reserved © 2025

,An indemnification clause in an engineer's design contract is typically tied

to:




A. Negligent engineering design


B. Claims submitted by parties affected by a failure


C. Project cost overruns


D. Improper construction methods by the Contractor - ✔✔A. Negligent

engineering design


Collusion on a construction project typically refers to which of the

following?




A. A practice where multiple contractors conspire to fix prices or rig bids


B. A system where public officials receive money from the contractor after

award


C. Falsely increasing the price of change order




3
Katelyn Whitman, All Rights Reserved © 2025

, D. Misrepresenting the amount of work that has been completed to get

advance payments - ✔✔A. A practice where multiple contractors conspire

to fix prices or rig bids


A preconstruction conference should be he held:




A. Prior to advertising for bids


B. After advertising for bids but before bids are received


C. After bid opening but before award of the contract


D. After execution of an agreement but before Notice to Proceed - ✔✔D.

After execution of an agreement but before Notice to Proceed


Types of submittals for engineer approval typically include all the

following except:


A. Product data


B. Shop drawings


C. Installation means and methods




4
Katelyn Whitman, All Rights Reserved © 2025
€11,53
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
KatelynWhitman West Virginia University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
1103
Membre depuis
2 année
Nombre de followers
482
Documents
34017
Dernière vente
3 jours de cela
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3,6

239 revues

5
95
4
39
3
54
2
20
1
31

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions