PE Exam - Civil: Breadth 0.3 m/s, wastewater treatment - fluid velocity in the grit removal 0.6 m/s, wastewater treatment - fluid velocity in the sewer 30% BOD - Primary ww treatment removes how much of BOD 60% solids - Primary ww treatment removes how much of solids AADT - ___=[total yearly volume] divided by 365 Abutments - structural components that connect the bridge to the ground at the ends of the bridge adsorption - involves removal of specific compounds from wastewater on solid surfaces using the forces of attraction between bodies aerated grit chamber - a type pf chamber where in compressed air is injected to keep lighter organic material in suspension while the heavier grit falls to the bottom Allowable strength design = demand = design load = - = required capacity of material based on the service loads allowable stress - In allowable strength design method, actual calculated stress cannot exceed.... allowable stress = - material strength / safety factor allowable strength design method Arch Bridge - type of bridge that relies on the strength and rigidity of the arch. the strength of an arch is that the structural members are always in compression and that it can distribute the load throughout the arch to the abutments. Average travel Speed [Mean speed] - ___ = sum[Frequency times speed] divided by [frequency] Backflow, wastewater - reverse flow of contaminants through a cross-connection into the potable water supply; this causes the inffectiveness of screening, as a result H2s will be formed in the septic tank band screen - perforated belt passes oven an upper and lower roller bar racks - 3-4 in apart, filter out larger debris bar screens - in water reclamation, these remove large objects from the water; 0.5 to 1.5 cm apart to filter out smaller debris barminutor - vertical bar screen with a cutting head that travels up and down the rack bars, shredding the interrupted material Beam Bridge - simplest type of bridge used to span the shortest distance Bending - force that causes a structure to sag when placed in the middle of it Biodegradable organics - composed principally of proteins, carbohydrates and fats, biodegradble organics are measured in BOD or COD brace - structural member used to provide structural stability Calc time between successive veh (sec/veh) - ___ = 3600/V (Transportation) Calc. spacing (S) in ft - ___ = 5280/density (Transportation) Calculates number of vehicles per hour per lane (vphpl) - v=S*D [Space mean speed time Density] Calculates number of vehicles per mile per lane - D=v/S (Transportation) Cantilevered bridge - type of beam bridge that can span greater distances than a simple beam bridge and often includes trusses in the framework capture rate - 6 ft3/million gal Carbonate Hardness, CH = - sum of equivalent weights of bicarbonate (HCO3-) and carbonate (CO3-) Cementitious materials - Include portland cement, blended hydraulic cements, expansive cement, other cementitious additives, including fly ash pozzolanszl, silica fume, and ground granulated blast furnace slag central core - reinforced concrete shaft at the center of the building channel design - the length and width of a (the distribution) channel channel type, horizontal flow grit chamber - oldest type of grit chamber chemical precipitation - is accomplished by producing a precipitate that will settle chlorine - purchaesd as liquid but is released to the

Montrer plus Lire moins
Établissement
PE-professional Engineer
Cours
PE-professional engineer









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
PE-professional engineer
Cours
PE-professional engineer

Infos sur le Document

Publié le
6 mars 2025
Nombre de pages
11
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

PE Exam - Civil: Breadth

0.3 m/s, wastewater treatment - fluid velocity in the grit removal

0.6 m/s, wastewater treatment - fluid velocity in the sewer

30% BOD - Primary ww treatment removes how much of BOD

60% solids - Primary ww treatment removes how much of solids

AADT - ___=[total yearly volume] divided by 365

Abutments - structural components that connect the bridge to the ground at the ends of the bridge

adsorption - involves removal of specific compounds from wastewater on solid surfaces using the forces
of attraction between bodies

aerated grit chamber - a type pf chamber where in compressed air is injected to keep lighter organic
material in suspension while the heavier grit falls to the bottom

Allowable strength design = demand = design load = - = required capacity of material based on the
service loads

allowable stress - In allowable strength design method, actual calculated stress cannot exceed....

allowable stress = - material strength / safety factor

allowable strength design method

Arch Bridge - type of bridge that relies on the strength and rigidity of the arch. the strength of an arch is
that the structural members are always in compression and that it can distribute the load throughout
the arch to the abutments.

Average travel Speed [Mean speed] - ___ = sum[Frequency times speed] divided by [frequency]

Backflow, wastewater - reverse flow of contaminants through a cross-connection into the potable water
supply; this causes the inffectiveness of screening, as a result H2s will be formed in the septic tank

band screen - perforated belt passes oven an upper and lower roller

, bar racks - 3-4 in apart, filter out larger debris

bar screens - in water reclamation, these remove large objects from the water; 0.5 to 1.5 cm apart to
filter out smaller debris

barminutor - vertical bar screen with a cutting head that travels up and down the rack bars, shredding
the interrupted material

Beam Bridge - simplest type of bridge used to span the shortest distance

Bending - force that causes a structure to sag when placed in the middle of it

Biodegradable organics - composed principally of proteins, carbohydrates and fats, biodegradble
organics are measured in BOD or COD

brace - structural member used to provide structural stability

Calc time between successive veh (sec/veh) - ___ = 3600/V (Transportation)

Calc. spacing (S) in ft - ___ = 5280/density (Transportation)

Calculates number of vehicles per hour per lane (vphpl) - v=S*D [Space mean speed time Density]

Calculates number of vehicles per mile per lane - D=v/S (Transportation)

Cantilevered bridge - type of beam bridge that can span greater distances than a simple beam bridge
and often includes trusses in the framework

capture rate - 6 ft3/million gal

Carbonate Hardness, CH = - sum of equivalent weights of bicarbonate (HCO3-) and carbonate (CO3-)

Cementitious materials - Include portland cement, blended hydraulic cements, expansive cement, other
cementitious additives, including fly ash pozzolanszl, silica fume, and ground granulated blast furnace
slag

central core - reinforced concrete shaft at the center of the building

channel design - the length and width of a (the distribution) channel

channel type, horizontal flow grit chamber - oldest type of grit chamber

chemical precipitation - is accomplished by producing a precipitate that will settle
€7,43
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
amon

Faites connaissance avec le vendeur

Seller avatar
amon kenyatta university
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
0
Membre depuis
1 année
Nombre de followers
0
Documents
35
Dernière vente
-
Paper Haven curated document for every need.

Welcome to Paper Haven, I\'ve crafted just for you. Dive into a world where documents aren\'t just documents but a promise to excellent research and scores. As the proud owner I\'ve meticulously selected each piece to offer you not just the latest versions of documents but the very best researched document that are going to sky rocket your studies. Simplify your research with documents that are verified, updated and ready to meet your unique needs and specifications.

Lire la suite Lire moins
0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions