Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Cas

PROJECT SCOPE AND SCHEDULING

Note
-
Vendu
-
Pages
21
Grade
B
Publié le
05-03-2025
Écrit en
2024/2025

The assignment includes definitions and answers with usable references and diagrams • Scope Creep • Methods to manage scope creep • Scope management tools • Work Breakdown Structure (WBS)

Établissement
Cours










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Cours

Infos sur le Document

Publié le
5 mars 2025
Nombre de pages
21
Écrit en
2024/2025
Type
Cas
Professeur(s)
Trevor naaido
Grade
B

Sujets

Aperçu du contenu

Project Scope and Scheduling

The assignment includes definitions and answers
with usable references and diagrams

 Scope Creep
 Methods to manage scope creep
 Scope management tools
 Work Breakdown Structure (WBS)

,Table of Contents
Question 1...................................................................................................................3

Introduction : A definition and discussion of scope creep:........................................3
An analysis of the sources of scope creep identified in the case study:..................3
Question 2...................................................................................................................8

Introduction................................................................................................................8
A discussion on each step of the methodology used to manage scope:..................8
Application of the relevant theory to the case study:..............................................12
Question 3.................................................................................................................14

Introduction..............................................................................................................14
Discussion on any 2 scope management tools and techniques:............................14
Diagram 1: WBS....................................................................................................16
Question 4.................................................................................................................19

Introduction..............................................................................................................19
Acceptable framework within which to allow scope creep in IT projects at ABC
Bank:.......................................................................................................................19
References.................................................................................................................21

, Question 1
Scope creep is identified often as the leading cause of project failure. It would
seem that ABC Bank has fallen victim to its negative effects. Analyse what are
the major sources of scope creep in ABC Bank’s IT projects and what can you
infer to be other possible sources of scope creep at ABC Bank?



Introduction : A definition and discussion of scope creep:



(Institute, 2013) defines scope creep as the uncontrolled expansion to a project or
product line without making the required adjustments to time, cost and other
resources. What this means is that additional requirements or deliverables may have
been added to the project, or the goal of the project has changed, intentionally or
unintentionally and key factors such as time, cost and available resources may not
have been considered or adjusted to make provision for the additional deliverables. It
becomes easy to add more work to projects when the scope is not clearly defined.
Scope creep does not only happen when projects are doing badly, some projects do
well and clients or stakeholders are so impressed that they request additional work.
Many project managers agree to this additional work as they base their decisions on
the work they’ve completed within the scope management plan, so they accept the
additional work without realizing the implication or making the required adjustments
to their cost, time and other resources required to complete the project.
(Kloppenborg, 2014)



An analysis of the sources of scope creep identified in the case study:
The case study mentions that a significant gap was identified in managing the scope
of projects at ABC Bank that allowed for ongoing changes to the scope of its IT
projects. The following areas have been identified as the sources of scope creep at
the bank:

Lack of scope control, poor project management and overall weak leadership at the
organisation. It has been identified that there has been a lack of scope control at the
bank, this means that management has allowed work to be added to projects without
€2,69
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
gloriacupido

Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
gloriacupido Management College of Southern Africa
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
0
Membre depuis
10 mois
Nombre de followers
0
Documents
7
Dernière vente
-
Selling Finance and Project Management Notes, Exam Prep and Assignments

Have passed my degree in Financial Management and Passed my Postgraduate Diploma in Project Management

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions