Management by Objectives - ANSWER1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: The bulk of the project budget will be spent in the execution phase - ANSWER2. During the full life cycle of the project, a plot of the project's expected expenditures will usually follow a characteristic S curve. This indicates that: Until the divestment of the operations at the end of the product life cycle - ANSWER14. Projects require project management while operations require business process management or operations management. Projects can intersect with operations at various points during the product lifecycle. Which of the following is not a stage to represent this? Chart of Accounts - ANSWER41. Any numbering system that is used to monitor project costs by category such as labor, supplies, or materials, for example, is called: Reviewing the performance of an installed software module - ANSWER42. An example of 'Validate Scope' process is : The original scope of the project plus or minus any scope changes - ANSWER44. A project manager is reviewing the scope of the project and the scope baseline of the project. Which of the following does it include? Assigning work to a specific resource - ANSWER46. When decomposing project work during WBS creation, which of the following activities is not part of the process : Subprojects - ANSWER17. Large projects may be divided into smaller, more manageable components known as, Program manager - ANSWER18. A manager who manages a group of related projects is called a -

Montrer plus Lire moins
Établissement
CAPM
Cours
CAPM








Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CAPM
Cours
CAPM

Infos sur le Document

Publié le
1 mars 2025
Nombre de pages
3
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CAPM Exam Practice Questions &
Answers Correct 100%
Management by Objectives - ANSWER1. The process of establishing clear and
achievable objectives, measuring their achievement, and adjusting performance in
accordance with the results of the measurement is called:

The bulk of the project budget will be spent in the execution phase - ANSWER2.
During the full life cycle of the project, a plot of the project's expected expenditures
will usually follow a characteristic S curve. This indicates that:

Until the divestment of the operations at the end of the product life cycle -
ANSWER14. Projects require project management while operations require business
process management or operations management. Projects can intersect with
operations at various points during the product lifecycle. Which of the following is not
a stage to represent this?

Chart of Accounts - ANSWER41. Any numbering system that is used to monitor
project costs by category such as labor, supplies, or materials, for example, is called:

Reviewing the performance of an installed software module - ANSWER42. An
example of 'Validate Scope' process is :

The original scope of the project plus or minus any scope changes - ANSWER44. A
project manager is reviewing the scope of the project and the scope baseline of the
project. Which of the following does it include?

Assigning work to a specific resource - ANSWER46. When decomposing project
work during WBS creation, which of the following activities is not part of the process :


Subprojects - ANSWER17. Large projects may be divided into smaller, more
manageable components known as,

Program manager - ANSWER18. A manager who manages a group of related
projects is called a -

customer satisfaction survey - ANSWER19. Which of the following activity is
conducted last as part of closing process group?

Initiation and planning - ANSWER21. A stakeholder has the greatest ability to
influence a project during -

Perform Quality Assurance - ANSWER24. Of the following, which is not a process
from the Planning Process Group?
€13,71
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
nursingismylife West Virginia University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
249
Membre depuis
2 année
Nombre de followers
174
Documents
9127
Dernière vente
2 semaines de cela

3,6

38 revues

5
14
4
12
3
3
2
1
1
8

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions