Questions & Answers
After a new product gets approved where does the new product go next? Correct Ans-product
Package design and distribution are the last two manufacturing processes that occur before the
product gets to the consumer. Correct Ans-true
A company develops a _____ program to guarantee high quality production. Correct Ans-
quality assurance
Scientists and engineers are studying manufacturing in ___ for the future. Correct Ans-space
Jesus Loves You Correct Ans-Jesus Love You
The trend toward giving workers more ___ will change manufacturing management. Correct
Ans-decision-making power
Jesus Loves You! Correct Ans-You Got This!
__ automation is used in custom or small batch production. Correct Ans-programmable
, ______________ automation is built into machinery in the form of gears, wiring, and other
hardware. Correct Ans-fixed
Fixed automation is very inexpensive. Correct Ans-false
In ____________ automation, there is no down time in between batch production. (8 Letters)
Correct Ans-flexible
Which technology uses programmed commands to perform a production process? Correct
Ans-automation
An automated system is capable of operating without human supervision. Correct Ans-true
__ is the systematic, step-by-step process used to find unknown facts or solutions to a problem.
Correct Ans-Research
Product _____________ refine the designs for a new product. Correct Ans-Engineers
Applied research solves a problem or has a practical purpose. Correct Ans-true
Applied research includes the following EXCEPT: Correct Ans-Demographic research