Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

California Contractors License Test Class Questions And Answers 2025

Note
-
Vendu
-
Pages
4
Grade
A+
Publié le
04-12-2024
Écrit en
2024/2025

If a contractor provides the owner with a 10-year written warranty covering a patio cover he has installed, and the cover begins to deteriorate after 5 years of being installed which is true? - ️️the state will hold the contractor liable for the entire term of the written warranty. Who is responsible for providing the owner a copy of the "Notice of Cancellation"? - ️️The Prime Contractor In which of the following circumstances must you provide your license number? - ️️All contracts, all Advertising, All preliminary Notices. Who is responsible for determining when the project is complete? - ️️The owner/ his Agent Stop Notices are Bonder for - ️️1 & 1/4 the amount of the claim In drawing up "Home Improvement Contracts," contractors should pay attention to the requirements of print typeface and point size of the notices and disclosures. Unless a larger typeface is specified in the law (Business and professions Code) text in any printed form should be: - ️️10-pt Typeface and the headers should be at least 10-pt Boldface The costs of running your business including office expenses etc, is called: - ️️Overhead expenses Direct Labor is compromised of: - ️️cost for labor and payroll taxes Which of the following may qualify for more than one contractors license? - ️️Sole proprietor. How many classifications may a qualifier add to a license? - ️️As many qualifications as he qualifies for. which of the following may be protected by a Contract Bond? - ️️-A client damaged by the contractors violation of the contract. -Any person damaged by contractor fraud -Any contractor damaged by contractors failure to pay wages.What is the best way for the homeowner to protect his property from having a lien placed on his property, when signing a Home improvement contract. - ️️Require the Prime Contractor to Supply a performance and Payment Bond. CSLB established the State Wide Investigative Fraud Team (SWIFT). CSLB'S SWIFT has the authority to: - ️️Cite those not properly licensed Which is not part of the Home Improvement Contract? - ️️Preliminary Notice What us the purpose of the Preliminary Notice? - ️️Assert Mechanic Liens and Stop notice Rights Preliminary Notices are filed? - ️️within 20 days from first furnishing labor or materials. Which of the following is the most important practices to follow when trying to avoid disagreements with an owner? - ️️Be sure to include a detailed description of the project and everything that is to be done in the contract.

Montrer plus Lire moins
Établissement
California Contractors License
Cours
California Contractors License








Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
California Contractors License
Cours
California Contractors License

Infos sur le Document

Publié le
4 décembre 2024
Nombre de pages
4
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

California Contractors License Test
Class Questions
If a contractor provides the owner with a 10-year written warranty covering a patio cover
he has installed, and the cover begins to deteriorate after 5 years of being installed
which is true? - ✔️✔️the state will hold the contractor liable for the entire term of the
written warranty.

Who is responsible for providing the owner a copy of the "Notice of Cancellation"? -
✔️✔️The Prime Contractor

In which of the following circumstances must you provide your license number? -
✔️✔️All contracts, all Advertising, All preliminary Notices.

Who is responsible for determining when the project is complete? - ✔️✔️The owner/
his Agent

Stop Notices are Bonder for - ✔️✔️1 & 1/4 the amount of the claim

In drawing up "Home Improvement Contracts," contractors should pay attention to the
requirements of print typeface and point size of the notices and disclosures. Unless a
larger typeface is specified in the law (Business and professions Code) text in any
printed form should be: - ✔️✔️10-pt Typeface and the headers should be at least 10-pt
Boldface

The costs of running your business including office expenses etc, is called: -
✔️✔️Overhead expenses

Direct Labor is compromised of: - ✔️✔️cost for labor and payroll taxes


Which of the following may qualify for more than one contractors license? - ✔️✔️Sole
proprietor.

How many classifications may a qualifier add to a license? - ✔️✔️As many
qualifications as he qualifies for.

which of the following may be protected by a Contract Bond? - ✔️✔️-A client damaged
by the contractors violation of the contract.
-Any person damaged by contractor fraud
-Any contractor damaged by contractors failure to pay wages.
€7,39
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
ACADEMICMATERIALS City University New York
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
570
Membre depuis
2 année
Nombre de followers
186
Documents
10590
Dernière vente
1 jours de cela

4,1

96 revues

5
53
4
12
3
21
2
3
1
7

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions