RF3701 ASSIGNMENT 06 SEMESTER 02 ANSWERS DUE 01 OCTOBER 2024 1.1. Discuss five constraints, besides a project budget, that a project manager must balance to successfully complete a project(5 marks). 1.2. Describe each phase of the project life cycle, referring to two core activities that usually occur in each phase. (10 marks). The Department of Business Management has developed a plan for a business clinic project in the conference rooms of four selected hotels in Mamelodi Township. The workshops aim to benefit 400 small business owners, facilitated by lecturers and postgraduate students, running 8 hours a day (except weekends) during September 2017. Business skills will be developed, marketing support will be provided, and business manuals and starter packs will be distributed to attendees. The objective is to improve business management skills in a turbulent environment. Develop a project charter by explaining the elements that form part of a project charter. Thereafter, provide specific practical examples for each of these elements based on the business clinic project. As a project manager for Nando’s you must manage a project with activities and their respective durations as listed in the table below: Activity Immediate Predecessor Duration (months) A None 2 B A 4 C A 2 D B 2 E B, C 4 F A, E 6 G D 4 H D, E, F 2 I G, H 6 J H, F 6 K H, I, J 4 3.1 Construct a network diagram to analyses your project. NB: The network diagram needs to have all the values otherwise zero marks will be awarded Answer: 3.2 What is the total project duration time? (1) Answer: 3.3 Identify the critical path on your network diagram. (1) Answer: 3.4 When is the latest time that activity G must be completed in order not to experience any delays in the project? (1) Answer: 3.5 What is the earliest time that activity D can possibly be completed? (1) Answer: 3.6 What is the free float for activity E with respect to activity H? Show your calculations. (4) Answer: 3.7 What would the implication to the project duration time be if there was a delay of 2 months in completing activity F? (1) Answer: Please include a complete list of references here: Total: 60 Marks

Montrer plus Lire moins
Établissement
Cours









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Cours

Infos sur le Document

Publié le
27 septembre 2024
Nombre de pages
11
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

RONSAM
TUTORS
PRM3701 ASSIGNMENT 06 DUE 01
OCTOBER 2024




DISCLAIMER!!!: The assignments sold through this website
are intended for research, study, and reference purposes
only. They are not to be submitted as your own work. Only
use this document as reference to generate your own
assignment


FOR EXAMS, PORTFOLIO, AND ASSIGNMENT ASSISTANCE
WHATSAPP 0671189059 EMAIL:


, QUESTION 1 [15 MARKS]


You have been invited to deliver a speech to young
graduates about important issues in project management.
To educate them properly answer the questions that
follow.
 Please note you will be required to do research on the
questions below.
 Also indicate your references

1.1. Discuss five constraints, besides a project budget, that
a project manager must balance to successfully
complete a project(5 marks).

1. Scope

Scope is one of the major regulatory factors that a project manager is
faced with in her work; it is understood as the defined goals, products,
and results that the project is set to accomplish. When not controlled or
veered into informally, scope creep the act of changing a project’s
objectives without authorization can impact other aspects of the project
if not controlled (Larson & Gray, 2018). That is why keeping the project
scope clear and avoiding project scope creep helps the project remain
on task and does not exhaust resources.


2. Time


Time concerns the project calendar, which is made up of due dates on
milestones, as well as the overall project duration. Time is highly sensitive as it
may result to costs wastage, unavailability of resources and finally, dissatisfaction
among the stakeholders (Larson & Gray, 2018). A project manager will need to
make certain that the project is on schedule, which is often done with automated
project scheduling tools, including Gantt charts and Critical Path Method (CPM).


3. Quality
€2,71
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
VBPSEDUPROS SN Tutors
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
723
Membre depuis
2 année
Nombre de followers
473
Documents
221
Dernière vente
1 semaine de cela
VBPS EDUPROS

Exams, assignment solutions and study notes

4,1

114 revues

5
69
4
13
3
16
2
4
1
12

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions