Mobile Crane Operator Core Review Questions with Verified Solutions |2024/2025 | Graded A+
Mobile Crane Operator Core Review Questions with Verified Solutions |2024/2025 | Graded A+ Distribute over a larger area. What is the purpose of placing mats or cribbing under outrigger floats? Upperworks. Where is the best location for leveling a crane? there is no weight of the crane bearing on any tires Before leveling a mobile crane on outriggers, an operator should ensure: Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? Keeping a 90° angle between cylinder rod and pad. Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? Keeping 90° angle between cylinder rod and pad. When may blocking (cribbing) be placed under outrigger beams on mobile cranes? Never approved. Mobile cranes should be level to within what percent of grade? 1% Timber crane mats work best when they are: bolted together. When arriving in the crane at the job site, the operator should first determine the condition of the: access roads. What surface listed below would NOT be a good location for assembly or setup of a mobile crane? Above underground vaults. Each outrigger pad and its blocking should be sufficient to support? The total weight of the crane and its load.
École, étude et sujet
- Établissement
- Mobile Crane Operator Core
- Cours
- Mobile Crane Operator Core
Infos sur le Document
- Publié le
- 9 juin 2024
- Nombre de pages
- 34
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
mobile crane operator core review questions with v
Document également disponible en groupe