Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

CAPM Exam 7th Edition Outline Guaranteed A+

Note
-
Vendu
-
Pages
17
Grade
A+
Publié le
03-06-2024
Écrit en
2023/2024

undertaken to create a unique product, service or result Program -ANSWER- A grouping of related projects that are managed together to capitalize on benefits that couldn't be achieved if the projects were managed separately Portfolio -ANSWER- includes programs, individual projects, and other related operational work that is prioritized and implemented to achieve a specific strategic business goal Project vs. Operations -ANSWER- An operation is different from a project in the following way: It does not create a unique product, service or a result. It does not have a definite beginning and an end. Predictive vs. adaptive approaches -ANSWER- Predictive = the scope of the project is clearly defined and fixed at the start of the project and any changes to the scope require rigorous change control procedures Adaptive = the scope isn't fixed and can evolve over time. agile, iterative, or incremental. Scope is defined and approved before start of an iteration. Also known as change-driven life cycles. Issues vs. Risks vs. Assumptions vs. Constraints -ANSWER- Issue = already has occurred Risk = is a potential issue that may or may not happen and can impact the project positively or negatively Assumptions = conditions that are supposed to be true. If these assumption terms turn false, they may become risks and issues Constraints = limitations imposed on the project. If they turn false, they would be beneficial for the project Review/critique project scope -ANSWER- Must be specific and measurable Work performed to create a deliverable that can be defined at the beginning of a project life cycle, or over the course of multiple iterations. Completion of a scope is measured against the original project management plan. Scope must be defined, validated, and controlled through the whole process. PMI Code of Ethics and Professional Conduct -ANSWER- responsibility, respect, fairness, and honesty Explain how a project can be a vehicle for change -ANSWER- The actual work that is performed in transitioning from the current state to a future state is the project. Projects are necessary to implement change to an organization. They transfer new deliverables to operations for a smooth transition of rules, ideas, and other processes to help improve operations. Describe the purpose and importance of cost, quality, risk, schedule, etc. -ANSWER- Integration - coordinating the various activities within various process groups. Processes to keep the project together. Scope - determines the work required, and only that work, needed to complete a project. Processes to define tasks & deliverables. Schedule - Managing timely completion of the project. Processes for time management. Cost - Approved budget and its planning and management. Processes to identify budget. Quality - Incorporation of company quality policy and continuous process improvement to meet stakeholder expectations. Processes for quality assurance. Resources - availability and management of righ

Montrer plus Lire moins
Établissement
CAPM 7TH EDITION
Cours
CAPM 7TH EDITION










Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CAPM 7TH EDITION
Cours
CAPM 7TH EDITION

Infos sur le Document

Publié le
3 juin 2024
Nombre de pages
17
Écrit en
2023/2024
Type
Examen
Contient
Questions et réponses

Sujets

€11,97
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
orlando25

Faites connaissance avec le vendeur

Seller avatar
orlando25 Chamberlain College Nursing
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
0
Membre depuis
2 année
Nombre de followers
0
Documents
72
Dernière vente
-

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions