NERC flashcard set Reliability coordinator (RC) 2024
NERC flashcard set Reliability coordinator (RC) 2024 What entity balances generation and monitors/employs contingency reserves? - Answer -Balancing Authority (BA) What entity has the widest system view and is the "supervisor"? - Answer -Reliability coordinator (RC) What entity monitors transmission lines and operates tap-changers, breakers, capacitors, etc? - Answer -Transmission Operators (TOP) What is a group of BAs that have agreements to help cover each other's reserve and regulation requirements? - Answer -Reserve Sharing Group (RSG) What entity schedules energy transitions and buys and sells energy? - Answer -Purchasing and Selling Entity (PSE) What's an LSE? - Answer -Load serving entity. (what it sounds like What's the difference between a GOP and a GO? - Answer -Generator Operator (entity that operates the generation). Generator Owner (owns generation, in charge of certain requirements needed to operate a generator in the NERC world) What does SCADA stand for? What's it do? - Answer -Supervisory control and data acquisition. It's the program/screen you use to see your equipment and operate it. (you'd see all your busses, breakers, switches, generators, capacitors, etc) What is inertia? - Answer -The kinetic energy "stored" in the power system's large, synchronous generators. Upon a loss of generation, inertia opposes the slowing of frequency. What is a "peaking" generator? - Answer -A generator that only comes on during the load peak in the day. Typically gas turbines. Name two types of generators that don't provide inertia. - Answer -Wind and Solar What can fuel restrictions lead to? - Answer -Capacity concerns (wet coal, natural gas distribution issues) What is p.u. - Answer -Per unit". 347kv of a line rated to 345kv will be slightly over 1.0 p.u. What are the units of Power? What are the units of Energy? - Answer -MW. MWH (MW-hrs). How much energy is produced if a generator does 100mw for 2 hours? - Answer -200 MWH What is the power triangle? - Answer -Draw it. It shows the relationship between MW and MVAR and why MW + MVAR ≠ MVA
École, étude et sujet
- Établissement
- NERC
- Cours
- NERC
Infos sur le Document
- Publié le
- 1 avril 2024
- Nombre de pages
- 15
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
nerc flashcard set reliability coordinator rc 20
-
nerc flashcard set reliability coordinator rc 2024
-
what entity balances generation and monitorsemplo
Document également disponible en groupe