CBSPD Tech Chapter 8-Preparation & Packaging of Instruments & Devices Already Passed
CBSPD Tech Chapter 8-Preparation & Packaging of Instruments & Devices Already Passed The air flow in the preparation and packaging area must be maintained at: A. Negative pressure B. Positive pressure C. Automatic pressure D. Constant pressure B. Positive pressure The preparation and packaging area MUST have an air exchange rate of: A. 4 per hour B. 6 per hour C. 8 per hour D. 10 per hour D. 10 per hour
École, étude et sujet
- Établissement
- CBSPD
- Cours
- CBSPD
Infos sur le Document
- Publié le
- 30 mars 2024
- Nombre de pages
- 9
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
cbspd tech chapter 8 preparation packaging
Document également disponible en groupe