CSMP Exam 39 Questions with Verified Answers,100% CORRECT
CSMP Exam 39 Questions with Verified Answers Prior to developing a CMSP, who should you contact to obtain latest copy of their guide - CORRECT ANSWER Servicing MLC Detailed estimate should include - CORRECT ANSWER Labor hours, materials, subcontractor costs Email routing of pics, sketches, charts, etc. are encouraged to do what? (submitted in CMPLUS) - CORRECT ANSWER Supplement Info Equipment & structures that need to be removed to accomplish work - CORRECT ANSWER Interferences On a CSMP when new electrical equipment is being installed, what needs to be specified - CORRECT ANSWER The panel # and nameplate data The cutters servicing (who) conducts a thorough review of the cutter's CSMP - CORRECT ANSWER NESU port engineer Who conducts the final review before approving it - CORRECT ANSWER NESU CO The CSMP help guide established & maintained by what (or) what - CORRECT ANSWER MLCLANT or MLCPC The CSMP help guide can be accessed by - CORRECT ANSWER Internet on ELC homepage The cutter should make & estimate based on (what) & complete cost of materials to perform the job - CORRECT ANSWER The cost of total hours Cutters shall generate all CSMP's within CMPLUS & export them electronically to what - CORRECT ANSWER FLS- Fleet Logistics System Database Provide the info needed to draft item specifications for shipyards availabilities - CORRECT ANSWER Another important function of CSMP CSMP's shall be prepared & submitted by the unit to - CORRECT ANSWER MLC- Maintenance & Logistics Commands If hazardous materials are known or suspected to be generally present aboard the ship in the area where repair has been scheduled, what should be written - CORRECT ANSWER Supplemental shipwork scpecification If a proposed change is within the scope of contract, the change is handled via - CORRECT ANSWER Contract modification If a proposed change is not within the scope of contract, what is required - CORRECT ANSWER New contract Priority for items to maintain personnel safety - CORRECT ANSWER High Is an extended maintenance period that has been planned to accomplish major repairs - CORRECT ANSWER Availability period Legally bonding contractual document key piece of evidence identifying what work the gov requires the ship manager to accomplish - CORRECT ANSWER A specification Used to initiate the specifications for a specific work item - CORRECT ANSWER CSMP CSMP approval - CORRECT ANSWER CO approval Criteria for determining whether requirements are met - CORRECT ANSWER Complete Spec = work requirements Primary method of documenting the need to accomplish major repairs and allerations - CORRECT ANSWER CSMP CSMP prep guide can be found - CORRECT ANSWER At your servicing MLC Measures Contractors Performance - CORRECT ANSWER Statement of Work The element by element examination of estimated or actual costs and proposed profit - CORRECT ANSWER Cost analysis Method of contracting that employs competitive bids, public openings of bids, and ultimate award of a fixed-price contract - CORRECT ANSWER Sealed bidding Procedure used by contracting officer that includes receipt of proposal from offers permits bargaining, and usually affords an opportunity to revise offers before contract and modification - CORRECT ANSWER Negotiations Any cost directly identified w/ a single final objective but identified w/ 2 or more final cost objectives. Also referred to as an overhaul - CORRECT ANSWER Indirect Cost CG form 2920 - CORRECT ANSWER Current Ships Maintenance Project (CSMP) After command approval, cutter exports CSMP to what using CMPLUS OPFAC (operating facility code) module. - CORRECT ANSWER FLS Items required to assure continued operational capability - CORRECT ANSWER Medium priority Items required to maintain operational capability involves cutter or personnel safety or is required by directives - CORRECT ANSWER High priority Extended maintenance period that has been planned for the accomplishment of major repairs and maintenance - CORRECT ANSWER Availability Items that improves the efficiency of the vessel or improve habitability. May be postponed w/ out affecting operational capability or reliability - CORRECT ANSWER Low priority Technical document that describes the min. Ship specific work requirements in clear , concise, well-defined and contractually sound term - CORRECT ANSWER Well written shipwork specification Legally binding contractual document that is the key piece of evidence identifying what work the government requires the ship manager to accomplish on prime/ sub contractors... and the repair contractor to accomplish under Invitation for Bid (IFB) type contractors - CORRECT ANSWER A specification Used to initiate the specifications for a specific work item - CORRECT ANSWER CSMP Who approves a CSMP - CORRECT ANSWER CO
École, étude et sujet
- Établissement
- CSMP
- Cours
- CSMP
Infos sur le Document
- Publié le
- 28 mars 2024
- Nombre de pages
- 4
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
csmp exam 39 questions with verified answers
Document également disponible en groupe