Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Dissertation

Essay Plan Project Management (BFA528)

Note
-
Vendu
-
Pages
3
Grade
A+
Publié le
22-03-2024
Écrit en
2022/2023

Providing an in depth essay plan for the final essay

Établissement
Cours








Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Cours
Inconnu
Cours

Infos sur le Document

Publié le
22 mars 2024
Nombre de pages
3
Écrit en
2022/2023
Type
Dissertation
Professeur(s)
Inconnu
Grade
A+

Sujets

Aperçu du contenu

Essay Plan



Contents

Introduction – talking about what is going to be included in the report including a bit of background
about the event.



Task 1

 Talking about projects, programmes, and portfolios, how they allow for improvement and
growth and enhance performance. Organisational change and how it links to the delivery of
strategy
 Strategic alignment, how it helps an organisation using a work breakdown structure, links
into ‘the How’ part of the breakdown structure
 How a business needs to implement the strategic vision and linking projects, outcomes and
benefits to make the overall organisational strategy.
 Reference saying that adopting a project and programme-oriented approach will increase
success, the more strategies a business has the more successful they will be.
 Steps for starting a project, having a vision, making sure the visions set a feasible for the
business, once it is feasible a business case should then be written to show expected costs.
 Make sure the interest is there in pursuing the project and get it approved by the project
sponsor/s
 Getting the project manager involved in writing the PMP, then get to the initiation of the
project.
 Project manager is key – make sure the project is running smoothly and they are going to
achieve their aims and objectives.
 Five major processes in managing a project, initiating, planning, executing, controlling and
closing (process is required for the project manager)
 Final step is completion, goals need to be looked back on to make sure everything is
achieved
 Project documentation needs to be handed over to the business, ensure they are happy with
the outcome.
 Communication with stakeholders



Task 2

Stakeholder Management
 What it is
 How it is important within a business
 What to do once the stakeholders are chosen
 Referenced APM with stakeholder engagement and management and how they are
the most important things when it comes to running a project.
 Mendelow Matrix – what it is and an example of one for the Olympic case study.
 How the Olympic infrastructure had lots of stakeholders.
 In 2005 the sponsor plan was written up, included all the stakeholders and their
involvement (included in appendices)
€8,45
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
5millg61

Faites connaissance avec le vendeur

Seller avatar
5millg61 Southampton Solent University
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
0
Membre depuis
1 année
Nombre de followers
0
Documents
40
Dernière vente
-

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions