API 510 Practice Test Questions and Answers 2024
Substituting NDE procedures for a pressure test after major repair may be done only after: API 510 5.8.8.1 - The engineer and inspector have approved. An example of vessels not covered by API 510 are: API 510 1.1.1 - Vessels officially retired from service and abandoned in place. ACFM is an acronym for: ASME SEC 5 Article 15 - Alternating Current Field Measurement A pneumatic testing precedure should be developed by whom before conducting the test? API 510 5.8.6 - Engineer A signal of discontinuity in the material under nondestructive examination is considered: API RP 577 3.1.36 - Indication In what type of service should vessels be evaluated for potential fatigue cracking failures and have appropriate inspections planned? API 510 5.4.4 - Cyclic Service Corrosion and other damage identified during inspections and examinations must be characterized, sized, and evaluated per Section 7 (Inspection Data Evaluation, Analysis, and Recording) with deviations from the inspection plan being approved by whom? API 510 5.5.1 - Inspector or Engineer Inspection tasks typically associated with hot tapping or welding on in-service equipment should include: API 577 11.2.5 - Positive Metal Identification (PMI) Any repair welding should be performed according to a procedure accepted by the: API 510 8.1.1 - Inspector or Engineer Welding of carbon steel with carbon contents over 0.30% API 510 8.1.5 - May need special attention and preheating to avoid weld cracking. Inspector recommendations can be changed or deleted after review by whom? API 510 6.9 - Pressure Vessel Engineer or Inspection Supervision
École, étude et sujet
- Établissement
- API 510
- Cours
- API 510
Infos sur le Document
- Publié le
- 19 mars 2024
- Nombre de pages
- 4
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
api 510 practice test
-
api 510
-
api 510 practice test questions and answers 2024
-
api 510 practice test questions and answers
Document également disponible en groupe