ACI Concrete Strength Testing Technician CP-19 (14) | 100% Correct Answers | Verified | Latest 2024 Version
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. - Planeness, perpendicularity Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - Plates, alignment, melting Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or _____. - Glass, metal granite or diabase Sulfur mortar cap plates should be formed against _____ or _____ plates. - Metal, Stone The purpose of the guide bar or bull's eye level is to ensure that caps remain perpendicular to the axis of the cylinder within 0.5 degrees. True or False? - True To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. - Peripheral heating
École, étude et sujet
- Établissement
- ACI Concrete
- Cours
- ACI Concrete
Infos sur le Document
- Publié le
- 8 mars 2024
- Nombre de pages
- 9
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
aci concrete strength testing technician cp 19 14
Document également disponible en groupe