CSLB B LICENSE GENERAL CONTRACTOR EXAM | 100% Correct Answers | Verified | Latest 2024 Version
If unused mortar stiffens due to hydration of cement, what must you do? - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - 24-48 Hours How long should you wait before installing tile on a shower pan? - 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Type-B Soils If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - 35V In a series circuit, the total voltage is divided equally. For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - 1:1 (45°) A Pittsburgh joint is used in: - HVAC ductwork
École, étude et sujet
- Établissement
- CSLB B LICENSE GENERAL CONTRACTOR
- Cours
- CSLB B LICENSE GENERAL CONTRACTOR
Infos sur le Document
- Publié le
- 22 février 2024
- Nombre de pages
- 43
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
cslb b license general contractor exam 100 corr
Aperçu du contenu
Document également disponible en groupe